我院抗震研究室接受电力部东北勘测设计阮的委托,参加了丰满水电站泄水洞水下岩塞爆破工程的大坝动力分析的计算工作,获得显著成果。 丰满水库是一个“以发电为主,发电和防洪同时并举”的大型综合利用工程。早在一九六二年,周恩来总理亲自视察了丰满水电站。为使丰满水库在特大
The seismic research room of our hospital was commissioned by Nguyen, Northeastern Ministry of Electric Power Survey and Design Institute, and participated in the calculation of the dam dynamic analysis of the underwater rock plug blasting project of the Fengman Hydropower Station. Significant achievements were obtained. Fengman Reservoir is a “large-scale integrated utilization project that takes power generation as its main task, power generation and flood control simultaneously.” As early as 1962, Premier Zhou Enlai personally inspected the Plumbing Station. In order to make plump reservoirs in extra large