水利工程前期工作中工程规模的选择 ,以前往往是在几个方案中选择一个合理、可行的方案进行规划设计 ,最后才进行其经济效益的分析 ,确定其经济性、合理性。使前期工作可能出现反复 ,既浪费时间 ,又增加了前期工作的投入 ,同时不能为工程决策提供超前的依据。采用规模—投入 ,规模—效益曲线分析法 ,可以较准确地把工程规模确定在合理的状态 (况 )下 ,然后再进行工程可行性研究及初步设计工作。
In the early stage of water conservancy project, the scale of the project was chosen. In the past, it was always a reasonable plan to choose a few programs to carry out the planning and design. Finally, the economic benefits were analyzed to determine its economy and rationality. So that the previous work may be repeated, not only a waste of time, but also increase the input of previous work, while not providing advanced engineering decision-making basis. Using scale - investment, scale - benefit curve analysis method, you can more accurately determine the size of the project in a reasonable state (condition), and then conduct engineering feasibility studies and preliminary design work.