中铁五局六公司衡茶吉铁路铺架项目部主要负责承建衡茶吉铁路HCJ-2标段制、架梁及线路铺设:全线的制架梁工程共计1157孔,正线铺轨291.206Km,站线铺轨57.0935Km,铺道岔202组,建安产值8.5亿。项目部自2009年5月进场以来,坚持以抓好质量安全文化建设促进企业文化建设的理念,加强项目安全质量文化建设,强化各级人员
The project of HCJ-2 section of Hengchaji-Jiamusi Railway is undertaken by the project department of Hengchaji Railway overhaul project of the fifth company of China Railway Fifth Bureau. The total length of the system is 1157 holes, with a total length of 291.206km, Line laying 57.0935Km, shop turnout 202 group, build an output value of 850 million. Since its entry in May 2009, the project department has adhered to the concept of promoting the building of an enterprise culture by focusing on the construction of a culture of quality and safety, strengthening the construction of the project’s safety and quality culture, and strengthening the personnel at all levels