论文部分内容阅读
经过事故现场的勘查,根据工程中构件的破坏情况采取了不同的加固方法。从建筑物的种类、结构特点、材料、施工条件以及使用功能等方面进行了综合考虑,制定了合理的施工设计方案,并提出了相应的加固工程的质量保证措施和验收方案。整个改造工程顺利验收,所采用的加固方法不仅节约了投资,还极大地缩短了工期。
After the scene of the accident investigation, according to the destruction of components in the project has taken a different reinforcement method. From the aspects of building types, structural features, materials, construction conditions and functions of use, we made a comprehensive consideration and developed a reasonable construction design scheme, and put forward the corresponding quality assurance measures and acceptance programs. Smooth acceptance of the entire renovation project, the reinforcement method used not only saves investment, but also greatly shorten the construction period.