北京谱仪Ⅱ顶点探测器的离线刻度

来源 :高能物理与核物理 | 被引量 : 0次 | 上传用户:z362523
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
介绍了在VCJULI基础上对北京谱仪Ⅱ顶点探测器进行离线刻度的方 法,包括整体T0的获得、单丝零时间t0的扣除、丝位的修正、顶点探测器相对 于主漂移室位置的校正以及漂移时间一漂移距离关系的修正等.并由此给出了 北京谱仪Ⅱ顶点探测器的主要参数:空间分辨好于100μm. The method of offline calibration of Beijing spectrometer Ⅱ vertex detector based on VCJULI is introduced. The method includes the whole T0 obtaining, the deduction of monofilament zero time t0, the correction of filament position and the correction of the position of the vertex detector relative to the main drift chamber As well as drift time drift distance relationship correction. And the main parameters of Beijing spectrometer Ⅱ vertex detector are given: the spatial resolution is better than 100μm.
其他文献
搜索了230Ac β延发裂变. 由60MeV/u18O离子照射232Th,通过多核子转移反应产生230Ra. 经放射化学分离和薄的230Raβ- 230 Ac源的制备,获得了108个230Ac原子. 该源对云母裂变
The quasistatic axial magnetic fields in plasmas produced by ultrashort laser pulses were measured by measuring the Faraday rotation angle of the backscattered
89Ru was synthesized in the reaction of 58Ni (36Ar, 2p3n) on the basis of a "p-γ" coincidence measurement by using a He-jet tape transport system, and its β-d
Prof. XUE Qunji, a senior expert in tribology from the CAS Lanzhou Institute of Chemical Physics (L1CP) and member of the Chinese Academy of Engineering, received
The compiling and digitalization of the Vegetation Map of the People "s Republic of China (h l,000.000) was finally completed with the eftbrts of three generations
On February 8. 2012, CAS President BAI Chunli and Canadian Minister of Natural Resources Joe 0liver signed a five-year Memorandum of Understanding (MoU) on Sustai
Numerical simulations have been done for a compressible mixing layer, in which the in_flow speed on the low speed side was made to have periodic undulations, so
目前随着生活水平的不断提高,节能建筑已成为建筑发展的首要目标,对于节能建筑采用暖通设备也是基本原则。减少暖通空调系统能耗意义重大,从设计和系统运行本身充分考虑各种节能
泡沫沥青不是一种新的沥青胶结料,而是一种新技术应用所带来的产物。泡沫沥青与其他稳定剂相比,优点表现为:(1)增加材料的剪切强度和水稳定性,这类混合料较水泥处治粒料更有柔性、
笔者结合了多年的经验对于公路桥梁在施工中各项措施及管理体系进行了探讨,就要达到项目管理的目的,使用市场经济及施工企业形象适应时代的发展。