论文部分内容阅读
2004年9月13日,艾默生过程管理公司在北京港澳中心召开了安全仪表系统及AMS Suite设备管理系统新品发布会,宣布在其新颖的智能化安全仪表系统(SIS)中采用可以自动进行部分行程测试的最终控制元件。这项集成方案对PlantWeb数字化工厂构架作出了进一步的创新,使用户获得更加安全的过程装备。 最终控制元件预先设定的部分行程测试将会提高安全等级,减少危险的现场巡检次数,延长强制检测的时间间隔。最终控制元件还可以利用具有在线诊断功能的数字化智能来提供有关最终控制元件的健康状况的信息。这些关
On September 13, 2004, Emerson Process Management held a new press conference on safety instrumented systems and AMS Suite equipment management systems at its Hong Kong-Macau Center in Beijing, announcing the introduction of a new technology in its new intelligent safety instrumented system (SIS) The final control element of the test. This integrated solution further innovates the PlantWeb digital plant architecture, enabling users to get safer process equipment. The final control element pre-set partial stroke test will improve the safety level, reduce the number of dangerous on-site inspections, to extend the mandatory testing of the time interval. The final control element may also utilize digital intelligence with online diagnostic capabilities to provide information about the health of the final control element. These off