论文部分内容阅读
高岭至天马第三回500千伏输变电工程,是国家电网公司深入贯彻科学发展观,加强东北—华北联网的关键工程,是服务清洁能源发展的绿色工程,也是冀北电力有限公司成立以来承担的首项国家电网公司重点工程。工程建成投运后,将大幅提高东北与华北电网间的能源输送能力,有效解决东北风电外送问题,推动东北大煤电、大风电基地的集约化、规模化开发,减轻华北地区电力需求紧张局面。同时,可以优化华北地区电网结构,实现全国范围的资源优化配置。
Kaolin to Tianma third 500 kV power transmission project, is the State Grid Corporation in-depth implementation of the scientific concept of development, strengthening the northeast - North China network of key projects, clean energy development is the green project, but also since the founding of Hebei Electric Power Co., Ltd. Bear the first state grid company key projects. After the project is completed and put into operation, it will substantially increase the energy transmission capacity between northeast and north China power grids, effectively solve the problem of wind power in northeast China, promote the intensive and large-scale development of northeast China’s large coal and wind power bases, and reduce the power shortage in North China. situation. At the same time, we can optimize the structure of power grids in North China and realize the optimal allocation of resources nationwide.