论文部分内容阅读
10月29日至30日国家测绘总局召集各有关测绘业务部门联席会议,进行了一次务虚。代表们对规范细则提出了很多意见。建筑工程部的代表说:规范要订得灵活些。城市测量的精度要求问题争论很大,有的说精度处决于施工单位。对建筑区是否需要达到5公分、非建筑区是否需要10公分这一看法也争论不决。比如要不要1/500测图问题,分次、分期、分片问题,快速简易测图问题,国际分幅问题均有各色各样的看法和意见。煤炭工业部的代表说:我们在太原会议中,对是否要规范和是否要订得灵活些争论很大。最后讨论结果,
From October 29 to 30, the State Administration of Surveying and Mapping convened a joint meeting of various surveying and mapping business departments and conducted a retreat. The delegates put forward many suggestions on the rules and regulations. The representative of the Department of Construction Engineering said that the norm should be flexible. The accuracy of urban measurement requirements controversial issue, and some say the accuracy depends on the construction unit. It is debatable whether construction sites need to reach 5 cm or not and whether non-construction areas require 10 cm. For example, whether to 1/500 mapping problems, grading, staging, fragmentation problems, rapid and easy mapping problems, the international framing problems have a variety of opinions and opinions. The representative of the Ministry of Coal Industry said: At the Taiyuan meeting, we had a great deal of debate about whether to regulate and whether to be flexible. The final discussion of the results,