论文部分内容阅读
本文分析了大别山电厂超临界600MW机组协调控制对AGC响应,对其进行分析总结,现场实际表明不断完善的协调系统使机组运行稳定,提高了机组的响应能力。
This paper analyzes the response of AGC to the coordinated control of 600 MW supercritical units in Dabieshan Power Plant, and analyzes and summarizes the results. The actual field shows that the constantly improving coordination system makes the unit stable and improves the response capability of the unit.