石漫滩水库,是新中国成立后在淮河流域修建的第一座大型水库,位于舞钢市境内的淮河上游洪河支流滚河上。原石漫滩水库建于1951年,“75·8”特大暴雨洪水期间垮坝。石漫滩水库复建工程于1993年9月开工,1998年1月竣工并投入运行。石漫滩水库为全断面碾压混凝土重力坝,流域面积230km~2,最大库容1.20亿m~3,最大坝高40.50m,坝长645m。2015年12月7日省发改委以《河南省发展和改革委员会关于省石漫滩水库除险加固工程初步设计的批复》(豫发改设计[2015]1475号),
Stone flood reservoir, is the founding of New China in the Huaihe River Basin built the first large-scale reservoir, located in Wugang city within the upper reaches of the Huaihe River tributary of the river. The original stone flood bank reservoir was built in 1951, “75.8 ” during a heavy storm flood collapse. Stone flood dam rehabilitation project started in September 1993, completed in January 1998 and put into operation. Shiranan Reservoir is a full-face RCC gravity dam with a drainage area of 230km ~ 2 and a maximum capacity of 120 million m ~ 3. The maximum dam height is 40.50m and the dam length is 645m. December 7, 2015 Provincial Development and Reform Commission approved “Preliminary Design of Reinforcement Project of Shi-wan-tan Reservoir in Henan Provincial Development and Reform Commission” (Yufa Reform Design [2015] No. 1475)