通过我部在重庆召开的土洋結合現場会議,使我們进一步明确了在基本建設中貫徹土洋結合的重要性,認識到只有貫徹了土洋結合的方針才能达到高速度建設的目的,才能做到真正的多快好省。会議結束后,我們参加会議的同志就立即到施工現場对某厂設計进行了一次全面的复查和修改。这个厂是在十月中旬开工的,当时决定建厂(土建部分)的期限为六个月;但是經过群众討論,認为三个月可以基本建成。我們在重庆开会的时候听到了这
Through the ministry’s combined local and foreign meeting held in Chongqing, we further clarified the importance of implementing the combination of land and ocean in the capital construction, and realized that only by implementing the policy of integrating land and ocean can we achieve the purpose of high-speed construction and can Really good and fast. After the meeting, our comrades participating in the meeting immediately went to the construction site to conduct a comprehensive review and revision of the design of the plant. The factory started construction in mid-October. At that time, it was decided that the period for building the factory (civil building part) was six months; but after mass discussion, it was considered that the three months could be basically completed. We heard this when we met in Chongqing