论文部分内容阅读
为了保证装机容量144MW的Kali Gandaki A水电工程建设能被当地居民接受,尼泊尔政府准备了全面的环境改善方案。2002年8月开始运行的KaliGandaki A水电工程为我们提供了很有价值的经验与教训,即哪些措施有效,哪些无效。为把环境影响评估及其相应的减缓改善措施与工程设计和施工
In order to ensure that 144MW of Kali Gandaki A hydropower project with an installed capacity of 144MW can be accepted by local residents, the government of Nepal has prepared a comprehensive environmental improvement plan. The KaliGandaki A hydropower project, which started operation in August 2002, provides us with valuable lessons and lessons, which measures are effective and which are not. For the environmental impact assessment and its corresponding mitigation measures and engineering design and construction