摘要:高层建筑深基坑施工作业作为建筑施工工程的重要组件之一,在整个建筑施工工程系统中发挥着基础性、承接化、制约式的关键效用。本文将通过深基坑作业流程之中的土方开挖、支护作业、砼灌注桩操作、降水处理四个方面进行深入探讨,从而得出切实科学的高层建筑深基坑施工流程的方针制定、模式创设以及措施应用,最终有力实现高层建筑深基坑作业系统的安全、稳定、协调地推进运转。
关键词:高层建筑施工;深基坑作业;问题解析;探索改进;施行措施
Abstract: the deep foundation pit of high-rise building construction engineering construction as one of important components in the whole construction project system, which plays a basic, undertake, restrictive key utility. This will be through the process of deep foundation pit excavation, supporting operation, concrete piles, dewatering operation handle four aspects carries on the thorough discussion, thus obtain the practical and scientific of the deep foundation pit of high-rise building construction process, construction and the measures of policy mode application, ultimately achieving deep foundation pit of high-rise building, operating system security stable, harmonious advance.
Key words: high-rise building; deep foundation work; problem analysis; to explore and improve the implementation of measures;
中圖分类号:TU473.2 文献标识:A
高层建筑深基坑的构建结构较为复杂,施工环节也相对细碎,加之诸如天气因素、自然灾害等外部不确定因素的综合制约影响,从而使得其更容易突发安全生产事故,进行系统规范、科学合理的深基坑施工技术的探究改进就显得必要而关键。而现阶段高层建筑深基坑施工流程主要覆盖土方开挖、支护作业、砼灌注桩操作、降水处理四个方面。
深基坑的土方基础处理是一项基础性作业,其不仅需要依据相关工程的设计图纸进行规范施工,而且还要切实紧密地结合深基坑工程所在地域的土质土壤、水文气候等自然条件的外部影响。支护作业、砼灌注桩操作、降水处理以及应急处理方案则更多涉及技术层面的实际应用,需要施工人员严格依照作业章程进行有序铺展推进。基于保障高层建筑深基坑的实体性能,牢固夯实基坑土方开挖构筑的流程施工、强化改进支护施工程序的工艺作业、细化提升砼灌注桩施工作业的实效、稳固拔高降水作业施工的操作质量,继而迅速提升施工作业团队整体的综合竞争力,从而有力助推高层建筑深基坑施工作业顺利协调的开展推进。
一、牢固夯实基坑土方开挖构筑的流程施工
(一) 规范加强开挖方式
就现阶段深基坑土方开挖的方式而言,台阶式依旧是较为实用的通用模式,该挖掘构筑模式施工步骤紧凑、操作较为简便、成本投入相对低廉。而由于台阶式坝基开挖所具备的层次性,那么就需要务必保障土方坑基整体的抗滑稳定的安全性,这样才能顺利有序地进行台阶高度差值的调整以及平台宽度的测试。相关施工作业人员需要基本保证每段土方坑基开挖平台的实际宽度应当整体大于坑底宽度的二分之一,而其台阶之间的实际高度差值应当保持在7-9m之间,且其土方坑基坡度之间的比值应当保证在比取值为1:0.33之间。由于施工作业现场的土方施工可能会因为土质变化以及降水干扰等外部条件的干扰制约而出现偏差失误,这就需要相关施工作业人员及时合理地将土方坑基切面沿斜向上的方向增加7°,从而稳定有效地保障整个土方作业施工的稳定性。
而鉴于城市建设规模的持续扩大,深基坑的实体面积也逐渐增加,基于有限土地资源的充分利用,高层建筑也开始呈现不断向下纵深拓展的趋势导向,尤其是在沿海发达地区,高层建筑地下纵深的深度都可达到5—6层之长,这就要求相关技术施工人员采用0.5—1.立方米斗的液压正铲挖掘,而其上层土方则需要采用铲运机、推土机辅助作业。而由于操作面较为狭窄, 地下水容量较大,则可以采用拉铲进行操作。而考虑到一些城市地下水位较高,此时分层作业需要先用正铲挖土机挖掘移除地下水位以上的土方,接着再将下水位的土方进行挖掘移除。
(二)更新改进建基面利用高程
深基坑土方的施工作业经常会遭遇坑体两侧高程坝段的实际高差不均衡的状况,这种偏差既有人为因素,也有自然条件干扰。鉴于此,相关施工作业人员应当针对高程坝段的实际高差进行合理调整,及时采用基岩标准进行坑体两侧部分的调整改进。而当土方施工区域出现大规模的微新岩石,并普遍呈现出断裂、软弱夹层、地质缺陷等态势之时,相关施工人员就要及时防范风化作用的干扰侵袭,并切实依据施工设计进行微新岩体的建坝改进,鉴于微新岩体岩质较为脆弱,一旦遭受风化侵蚀将更为破碎,相关技术人员应当迅速精确地调整坑体积水溢流坝段建基面的开挖高程,从而使得坑体土方两侧挡水部分得以适量补充。
(三)精确拓展地质缺陷的处理优化
在深基坑土方的开挖过程之中,断层、软弱夹层是频繁引发坑体两侧土方坍塌下陷的两个主要环节,很大程度上拖慢制约了土方处理的施工进度与综合实效。为了全面有效地保障坑体土方处理的安全稳定性,相关施工作业人员需要及时规范地通过利塞、掏挖等方式途径的疏导处理,针对性地进行断层与软弱夹层的地质缺陷处理防护。需要注意的是,断层混凝土塞的挖掘深度应当保持在与断层宽度的100%-150%的比例范围之内,同时需要调整延伸至坑体土方之外的2-3m。
二、强化改进支护施工程序的工艺作业
(一) 进一步规范施工放样定位的准确严密
在进行支护钢板桩的插打之前,相关技术工作人员务必需要对位桩以及横梁进行准确定位,保持桩体定位按照施工规则进行规范归位。一般情况下需要采用钢管桩进行定位,通过向四个角位进行内外各四根的定位布置,每根定位横梁则需要由钢板桩的第一层支护。定位横梁需要在定位钢管四周外侧进行安置插放,以保证其可以和钢管进行有效相连。而定位横梁的插放位置务必需要依照标高额度、既定位置进行放置,保钢板桩依次排列在一条直线上面。同时需要在钢管桩的地面部分安置警告路障,从而有效防止施工人员践踏、机械设备碾压而导致的钢板桩锁口拼接处的严重形变。
(二)严格把关钢板桩的打入推进流程操作
首先,从钢板桩在支护中心部位打入钢板桩片体开始,相关操作人员就需要改变打入路线,渐次移向两边进行插打作业,而在进行两边插打之时,需要及时将倾斜的桩体进行调整扶正,保持桩体的总体垂直;其次,需要使用上下双层的导梁进行辅助插打,以保证插打的第一片钢板桩的绝对垂直度。同步需要做好反复检测调整钢板桩位,在确保绝对垂直度之后方可进行标高设计;最后,在每完成3m的插打作业之后都要进行测量校正,再次保证打入的桩体保持在同一直线上,同时使用振动锤对其向下敲打,以固定桩体的最终位置。需要注意的是,在插打的过程中,相关技术人员需要同步进行止水作业,从而有效防止钢板桩支护因频繁作业而出现的渗水、漏水现象。
(三)及时处理支护内部水流渗透与杂物堵漏
鉴于施工作业中深水基坑的范围较为广泛,地下水位较高,所以也就无法避免钢板桩支护挖掘堆砌之时的水分渗透、杂物堵塞而对于插桩作业带来的施工障碍,那么及时处理支护内部水流的渗透与杂物的堵漏就显得必要而关键。
相关技术工作人员可以在钢板桩插打之前就在锁口处涂抹麻油、木屑等光滑细碎物品辅助润滑防堵。必要之时还可以在内侧嵌塞填充棉絮,并在外侧包裹防水条布,从而发挥防水减压的关键效用。在钢板桩支护的抽水作业过程中,由于伴随着水流抽动的巨大作用力,大量木屑、碎石、土块等杂物都会被水流席卷夹带进入支护出水口,并在短期内形成大体积堆积物,从而堵塞支护出水口,提升其水位高度,并增大其受压额度,最终导致支护部分或大面积堵漏现象的出现。针对这一情况,则可以在钢板桩外侧补打木桩支护,并在其内侧铺设彩条油布,通过在彩条布与钢板桩支护之间的孔隙内填充高粘性软土构筑基台进行有效封堵。
(四)规范改进钢板桩抽拔移除的环节工序
钢板桩抽拔移除是支护施工作业的关键工序,也是最容易出现操作失误的环节步骤。这就要求相关技术操作人员严格遵照相关规则进行操作执行,在对钢板桩进行抽拔移除之前,我们需要采用振动锤对每个板桩的打入情况进行敲打判断、数据收集,从而有针对性地做出抽拔移除操作作业的流程计划。而在对墩柱浇筑的主体工作完成之后,我们需要进行一系列切割工作,同时采用50t的大型履带吊进行辅助抽拔。而在内支撑被全部抽拔移除之后,我们方可进行钢板桩的抽拔移除,首先需要先用振动锤将桩体依次向上拔高1-2m,并轻轻敲打使其彻底松动,然后再依次抽拔移除,对于已经打卷变形的桩体,则可以加大抽拔力度,将与之相邻的桩体一齐抽拔移除。而在桩体抽拔移除过程之中,为了有效防止误将相近的板桩被同时抽拔,需要将钢板桩与加固槽钢一一割断,并及时清除沙土碎块,以保证接下来抽拔移除操作的顺畅效率。
三、细化提升砼灌注桩施工作业的水准实效
(一) 严格规范卡管部件的质量控制
鉴于砼料的和易性差、流动性不稳定所导致的离析作用而引发的卡管现象,相关施工作业人员需要采用适当简易的方法进行及时处理,切忌麻痹大意、疏忽懈怠。而考虑到基坑围护施工现场的复杂情况,相关技术作业人员可以通过钢筋直径冲捣、导管外架设焊铁板、利用导管自由下落之时铁板与其它卡座的碰撞打击产生振动作用力等方法进行疏通处理。
(二)充分提升导管进水的故障应对
导管进水的原因大多是由于首灌砼量分量不足以及导管口抬升过高所致,具体原因需要在施工现场进行具体分析。针对第一种原因,相关技术施工人员可以通过皮料导管进行吸水操作,充分彻底地将孔洞内部的砼水吸收,并二次灌注;而鉴于第二种的导管口升高所致的进水,相关技术操作人员需要在尚未形成初凝状态的孔洞表面进行导管插伸,并通过小功率泥浆泵将管道内部的泥浆全部抽出,并依照第一种进水处理的方法进行砼料二次浇灌。而当导管距离桩顶的距离并不算远之时,则需要及时清除管内的碎屑渣滓以及弱砼层,并安置相同口径模板。
(三)严格规范核查混凝土原料配比参数
相关施工作业人员应当选择吸收率大的骨料作为灌注混凝土的原料,这种骨料的干缩较大、骨料含泥量也相对较多,在进行混凝土灌注桩作业之时,也会增大混凝土的干缩性。而相关施工人员也需要依据施工现场的浇捣工艺、操作水平、构件截面等实际情况,切实合理地选择混凝土的设计坍落度,并且需要及时针对桥梁现场的砂质、石躁材料的具体情况及时调整作业的配合比,尤其是在改善骨料级配的操作中,务必按照标准规范掺加粉煤灰以及高效减水剂,从而有效减少水泥的用量。另外就是尽量选用低碱或者无碱的外加剂,同时通过采用适量规范的掺和料、外加剂,进一步降低碱骨料反应,从而保证混凝土块体的坚固、耐磨。
四、稳固拔高降水作业施工的操作质量
(一) 严格规范降水井的放置架设
鉴于现阶段城市地区深基坑施工作业之中频繁遭遇的地下水过深而引发的施工难度增加、作业进度受阻,集约高效的降水工艺适配运作就显得必要而关键。笔者认为在地下水水位较深的施工场地则适宜采取柔性强度较高的UPV井管作为滤管,其过滤器的口径应当与井管的孔径保持一致,而沉淀管道则用于辅助井内沉砂,其直径也需要与滤水管口径保持一致,基本上都在1M,其底部需要牢固封死,以避免降水回流。而采用的砂质滤料则务必沿井底由下往上到达滤水管顶端接口的1M进行围填操作。
需要相关施工人员注意的是,降水井的架设需要兼顾彼此相邻的两口降水井之间残留水的高程,为了保障作业安全,当降水井边水位抵达砂性底板之时,其所对应的水力坡度应当保持在1/10,且其残留降水的厚度应当≤1M。
(二) 有效提升降水井作业操作的流程实效
降水成孔作业的主要设备可以采取潜挖式钻机,该类型钻机成孔快速、井管放置简易,适宜在地下水位较深的基坑场地进行。在完成井管下入操作之后,相关施工技术人员应当迅速在井管以及土壁缝隙之间填埋砂砾滤料,并对真空泵、潛水泵进行规格参数、作业性能的试运行检测,以保障正式施工之时的稳定安全。
而抽水真空泵的连接组合方式则较为细致,需要由每台真空泵对应并联3——4口管井,且每口管井相应需要1-2台潜水泵作为辅助。而在完成各个井口、地面标高、静止水位以及抽水装置、抽水排水平台的安全性能之后,相关技术人员则可以进行降水操作。首先,需要对对各个降水井进行真空作业,其真空度应当保持在-0.06MPA以上;其次,真空抽水需要采取真空泵、潜水泵交叉并行的操作模式,而正式降水则需要在基坑开挖之前的20-30d开始铺展;第三,相关技术人员务必要在现场进行地下水位的实时降低。严格实行24小时班组排查制,并及时对已经停抽的机井进行每日2—3次的水位测量,从而切实保障降水操作的协调有序。
五、结语
深基坑施工作业作为一项具备专业性、技术式、组件化的综合流程工作集合,在整个高层建筑施工工程运营系统中发挥着基础性、制约性、总领性的关键效用,也是保障整个高层建筑施工作业运作体系物质实体的前提要件。牢固夯实基坑土方开挖构筑的流程施工、强化改进支护施工程序的工艺作业、细化提升砼灌注桩施工作业的水准实效、稳固拔高降水作业施工的操作质量。从而快速有效地降低高层建筑深基坑施工作业过程中的安全事故的发生率,继而提升整个高层建筑深基坑施工作业系统的综合竞争力,最终协调辅助高层建筑施工工程安全、稳定、协调地运营推进。
参考文献:
[1]程杨.高层建筑深基坑土方开挖的技术措施[J].才智, 2011(7).
[2]斐俊.高层建筑深基坑的设计与施工研究[J].城市建设理论研究, 2011(15).
[3]林安武.关于某高层建筑深基坑支护技术的探讨[J].建材与装饰, 2011(19).
[4]尹玉娟.高层建筑深基坑边坡支护实例分析[J].建筑, 2011(19).
[5]杨东宇.浅谈高层建筑深基坑土方开挖技术[J].大科技 科技天地, 2011(19).
关键词:高层建筑施工;深基坑作业;问题解析;探索改进;施行措施
Abstract: the deep foundation pit of high-rise building construction engineering construction as one of important components in the whole construction project system, which plays a basic, undertake, restrictive key utility. This will be through the process of deep foundation pit excavation, supporting operation, concrete piles, dewatering operation handle four aspects carries on the thorough discussion, thus obtain the practical and scientific of the deep foundation pit of high-rise building construction process, construction and the measures of policy mode application, ultimately achieving deep foundation pit of high-rise building, operating system security stable, harmonious advance.
Key words: high-rise building; deep foundation work; problem analysis; to explore and improve the implementation of measures;
中圖分类号:TU473.2 文献标识:A
高层建筑深基坑的构建结构较为复杂,施工环节也相对细碎,加之诸如天气因素、自然灾害等外部不确定因素的综合制约影响,从而使得其更容易突发安全生产事故,进行系统规范、科学合理的深基坑施工技术的探究改进就显得必要而关键。而现阶段高层建筑深基坑施工流程主要覆盖土方开挖、支护作业、砼灌注桩操作、降水处理四个方面。
深基坑的土方基础处理是一项基础性作业,其不仅需要依据相关工程的设计图纸进行规范施工,而且还要切实紧密地结合深基坑工程所在地域的土质土壤、水文气候等自然条件的外部影响。支护作业、砼灌注桩操作、降水处理以及应急处理方案则更多涉及技术层面的实际应用,需要施工人员严格依照作业章程进行有序铺展推进。基于保障高层建筑深基坑的实体性能,牢固夯实基坑土方开挖构筑的流程施工、强化改进支护施工程序的工艺作业、细化提升砼灌注桩施工作业的实效、稳固拔高降水作业施工的操作质量,继而迅速提升施工作业团队整体的综合竞争力,从而有力助推高层建筑深基坑施工作业顺利协调的开展推进。
一、牢固夯实基坑土方开挖构筑的流程施工
(一) 规范加强开挖方式
就现阶段深基坑土方开挖的方式而言,台阶式依旧是较为实用的通用模式,该挖掘构筑模式施工步骤紧凑、操作较为简便、成本投入相对低廉。而由于台阶式坝基开挖所具备的层次性,那么就需要务必保障土方坑基整体的抗滑稳定的安全性,这样才能顺利有序地进行台阶高度差值的调整以及平台宽度的测试。相关施工作业人员需要基本保证每段土方坑基开挖平台的实际宽度应当整体大于坑底宽度的二分之一,而其台阶之间的实际高度差值应当保持在7-9m之间,且其土方坑基坡度之间的比值应当保证在比取值为1:0.33之间。由于施工作业现场的土方施工可能会因为土质变化以及降水干扰等外部条件的干扰制约而出现偏差失误,这就需要相关施工作业人员及时合理地将土方坑基切面沿斜向上的方向增加7°,从而稳定有效地保障整个土方作业施工的稳定性。
而鉴于城市建设规模的持续扩大,深基坑的实体面积也逐渐增加,基于有限土地资源的充分利用,高层建筑也开始呈现不断向下纵深拓展的趋势导向,尤其是在沿海发达地区,高层建筑地下纵深的深度都可达到5—6层之长,这就要求相关技术施工人员采用0.5—1.立方米斗的液压正铲挖掘,而其上层土方则需要采用铲运机、推土机辅助作业。而由于操作面较为狭窄, 地下水容量较大,则可以采用拉铲进行操作。而考虑到一些城市地下水位较高,此时分层作业需要先用正铲挖土机挖掘移除地下水位以上的土方,接着再将下水位的土方进行挖掘移除。
(二)更新改进建基面利用高程
深基坑土方的施工作业经常会遭遇坑体两侧高程坝段的实际高差不均衡的状况,这种偏差既有人为因素,也有自然条件干扰。鉴于此,相关施工作业人员应当针对高程坝段的实际高差进行合理调整,及时采用基岩标准进行坑体两侧部分的调整改进。而当土方施工区域出现大规模的微新岩石,并普遍呈现出断裂、软弱夹层、地质缺陷等态势之时,相关施工人员就要及时防范风化作用的干扰侵袭,并切实依据施工设计进行微新岩体的建坝改进,鉴于微新岩体岩质较为脆弱,一旦遭受风化侵蚀将更为破碎,相关技术人员应当迅速精确地调整坑体积水溢流坝段建基面的开挖高程,从而使得坑体土方两侧挡水部分得以适量补充。
(三)精确拓展地质缺陷的处理优化
在深基坑土方的开挖过程之中,断层、软弱夹层是频繁引发坑体两侧土方坍塌下陷的两个主要环节,很大程度上拖慢制约了土方处理的施工进度与综合实效。为了全面有效地保障坑体土方处理的安全稳定性,相关施工作业人员需要及时规范地通过利塞、掏挖等方式途径的疏导处理,针对性地进行断层与软弱夹层的地质缺陷处理防护。需要注意的是,断层混凝土塞的挖掘深度应当保持在与断层宽度的100%-150%的比例范围之内,同时需要调整延伸至坑体土方之外的2-3m。
二、强化改进支护施工程序的工艺作业
(一) 进一步规范施工放样定位的准确严密
在进行支护钢板桩的插打之前,相关技术工作人员务必需要对位桩以及横梁进行准确定位,保持桩体定位按照施工规则进行规范归位。一般情况下需要采用钢管桩进行定位,通过向四个角位进行内外各四根的定位布置,每根定位横梁则需要由钢板桩的第一层支护。定位横梁需要在定位钢管四周外侧进行安置插放,以保证其可以和钢管进行有效相连。而定位横梁的插放位置务必需要依照标高额度、既定位置进行放置,保钢板桩依次排列在一条直线上面。同时需要在钢管桩的地面部分安置警告路障,从而有效防止施工人员践踏、机械设备碾压而导致的钢板桩锁口拼接处的严重形变。
(二)严格把关钢板桩的打入推进流程操作
首先,从钢板桩在支护中心部位打入钢板桩片体开始,相关操作人员就需要改变打入路线,渐次移向两边进行插打作业,而在进行两边插打之时,需要及时将倾斜的桩体进行调整扶正,保持桩体的总体垂直;其次,需要使用上下双层的导梁进行辅助插打,以保证插打的第一片钢板桩的绝对垂直度。同步需要做好反复检测调整钢板桩位,在确保绝对垂直度之后方可进行标高设计;最后,在每完成3m的插打作业之后都要进行测量校正,再次保证打入的桩体保持在同一直线上,同时使用振动锤对其向下敲打,以固定桩体的最终位置。需要注意的是,在插打的过程中,相关技术人员需要同步进行止水作业,从而有效防止钢板桩支护因频繁作业而出现的渗水、漏水现象。
(三)及时处理支护内部水流渗透与杂物堵漏
鉴于施工作业中深水基坑的范围较为广泛,地下水位较高,所以也就无法避免钢板桩支护挖掘堆砌之时的水分渗透、杂物堵塞而对于插桩作业带来的施工障碍,那么及时处理支护内部水流的渗透与杂物的堵漏就显得必要而关键。
相关技术工作人员可以在钢板桩插打之前就在锁口处涂抹麻油、木屑等光滑细碎物品辅助润滑防堵。必要之时还可以在内侧嵌塞填充棉絮,并在外侧包裹防水条布,从而发挥防水减压的关键效用。在钢板桩支护的抽水作业过程中,由于伴随着水流抽动的巨大作用力,大量木屑、碎石、土块等杂物都会被水流席卷夹带进入支护出水口,并在短期内形成大体积堆积物,从而堵塞支护出水口,提升其水位高度,并增大其受压额度,最终导致支护部分或大面积堵漏现象的出现。针对这一情况,则可以在钢板桩外侧补打木桩支护,并在其内侧铺设彩条油布,通过在彩条布与钢板桩支护之间的孔隙内填充高粘性软土构筑基台进行有效封堵。
(四)规范改进钢板桩抽拔移除的环节工序
钢板桩抽拔移除是支护施工作业的关键工序,也是最容易出现操作失误的环节步骤。这就要求相关技术操作人员严格遵照相关规则进行操作执行,在对钢板桩进行抽拔移除之前,我们需要采用振动锤对每个板桩的打入情况进行敲打判断、数据收集,从而有针对性地做出抽拔移除操作作业的流程计划。而在对墩柱浇筑的主体工作完成之后,我们需要进行一系列切割工作,同时采用50t的大型履带吊进行辅助抽拔。而在内支撑被全部抽拔移除之后,我们方可进行钢板桩的抽拔移除,首先需要先用振动锤将桩体依次向上拔高1-2m,并轻轻敲打使其彻底松动,然后再依次抽拔移除,对于已经打卷变形的桩体,则可以加大抽拔力度,将与之相邻的桩体一齐抽拔移除。而在桩体抽拔移除过程之中,为了有效防止误将相近的板桩被同时抽拔,需要将钢板桩与加固槽钢一一割断,并及时清除沙土碎块,以保证接下来抽拔移除操作的顺畅效率。
三、细化提升砼灌注桩施工作业的水准实效
(一) 严格规范卡管部件的质量控制
鉴于砼料的和易性差、流动性不稳定所导致的离析作用而引发的卡管现象,相关施工作业人员需要采用适当简易的方法进行及时处理,切忌麻痹大意、疏忽懈怠。而考虑到基坑围护施工现场的复杂情况,相关技术作业人员可以通过钢筋直径冲捣、导管外架设焊铁板、利用导管自由下落之时铁板与其它卡座的碰撞打击产生振动作用力等方法进行疏通处理。
(二)充分提升导管进水的故障应对
导管进水的原因大多是由于首灌砼量分量不足以及导管口抬升过高所致,具体原因需要在施工现场进行具体分析。针对第一种原因,相关技术施工人员可以通过皮料导管进行吸水操作,充分彻底地将孔洞内部的砼水吸收,并二次灌注;而鉴于第二种的导管口升高所致的进水,相关技术操作人员需要在尚未形成初凝状态的孔洞表面进行导管插伸,并通过小功率泥浆泵将管道内部的泥浆全部抽出,并依照第一种进水处理的方法进行砼料二次浇灌。而当导管距离桩顶的距离并不算远之时,则需要及时清除管内的碎屑渣滓以及弱砼层,并安置相同口径模板。
(三)严格规范核查混凝土原料配比参数
相关施工作业人员应当选择吸收率大的骨料作为灌注混凝土的原料,这种骨料的干缩较大、骨料含泥量也相对较多,在进行混凝土灌注桩作业之时,也会增大混凝土的干缩性。而相关施工人员也需要依据施工现场的浇捣工艺、操作水平、构件截面等实际情况,切实合理地选择混凝土的设计坍落度,并且需要及时针对桥梁现场的砂质、石躁材料的具体情况及时调整作业的配合比,尤其是在改善骨料级配的操作中,务必按照标准规范掺加粉煤灰以及高效减水剂,从而有效减少水泥的用量。另外就是尽量选用低碱或者无碱的外加剂,同时通过采用适量规范的掺和料、外加剂,进一步降低碱骨料反应,从而保证混凝土块体的坚固、耐磨。
四、稳固拔高降水作业施工的操作质量
(一) 严格规范降水井的放置架设
鉴于现阶段城市地区深基坑施工作业之中频繁遭遇的地下水过深而引发的施工难度增加、作业进度受阻,集约高效的降水工艺适配运作就显得必要而关键。笔者认为在地下水水位较深的施工场地则适宜采取柔性强度较高的UPV井管作为滤管,其过滤器的口径应当与井管的孔径保持一致,而沉淀管道则用于辅助井内沉砂,其直径也需要与滤水管口径保持一致,基本上都在1M,其底部需要牢固封死,以避免降水回流。而采用的砂质滤料则务必沿井底由下往上到达滤水管顶端接口的1M进行围填操作。
需要相关施工人员注意的是,降水井的架设需要兼顾彼此相邻的两口降水井之间残留水的高程,为了保障作业安全,当降水井边水位抵达砂性底板之时,其所对应的水力坡度应当保持在1/10,且其残留降水的厚度应当≤1M。
(二) 有效提升降水井作业操作的流程实效
降水成孔作业的主要设备可以采取潜挖式钻机,该类型钻机成孔快速、井管放置简易,适宜在地下水位较深的基坑场地进行。在完成井管下入操作之后,相关施工技术人员应当迅速在井管以及土壁缝隙之间填埋砂砾滤料,并对真空泵、潛水泵进行规格参数、作业性能的试运行检测,以保障正式施工之时的稳定安全。
而抽水真空泵的连接组合方式则较为细致,需要由每台真空泵对应并联3——4口管井,且每口管井相应需要1-2台潜水泵作为辅助。而在完成各个井口、地面标高、静止水位以及抽水装置、抽水排水平台的安全性能之后,相关技术人员则可以进行降水操作。首先,需要对对各个降水井进行真空作业,其真空度应当保持在-0.06MPA以上;其次,真空抽水需要采取真空泵、潜水泵交叉并行的操作模式,而正式降水则需要在基坑开挖之前的20-30d开始铺展;第三,相关技术人员务必要在现场进行地下水位的实时降低。严格实行24小时班组排查制,并及时对已经停抽的机井进行每日2—3次的水位测量,从而切实保障降水操作的协调有序。
五、结语
深基坑施工作业作为一项具备专业性、技术式、组件化的综合流程工作集合,在整个高层建筑施工工程运营系统中发挥着基础性、制约性、总领性的关键效用,也是保障整个高层建筑施工作业运作体系物质实体的前提要件。牢固夯实基坑土方开挖构筑的流程施工、强化改进支护施工程序的工艺作业、细化提升砼灌注桩施工作业的水准实效、稳固拔高降水作业施工的操作质量。从而快速有效地降低高层建筑深基坑施工作业过程中的安全事故的发生率,继而提升整个高层建筑深基坑施工作业系统的综合竞争力,最终协调辅助高层建筑施工工程安全、稳定、协调地运营推进。
参考文献:
[1]程杨.高层建筑深基坑土方开挖的技术措施[J].才智, 2011(7).
[2]斐俊.高层建筑深基坑的设计与施工研究[J].城市建设理论研究, 2011(15).
[3]林安武.关于某高层建筑深基坑支护技术的探讨[J].建材与装饰, 2011(19).
[4]尹玉娟.高层建筑深基坑边坡支护实例分析[J].建筑, 2011(19).
[5]杨东宇.浅谈高层建筑深基坑土方开挖技术[J].大科技 科技天地, 2011(19).