论文部分内容阅读
奥地利林伯格Ⅱ级抽水蓄能电站于2012年竣工后将使卡普伦水电工程的出力提高1倍以上。介绍了林伯格Ⅱ级抽水蓄能电站的概况,探讨了该国水电发展前景。
Completion of the Linneng Ⅱ Grade Pumped Storage Power Station in Austria in 2012 will double the output of the Kaplan hydropower project. The general situation of Limburg Ⅱ Pumped Storage Power Station is introduced, and the prospect of hydropower development in this country is discussed.