论文部分内容阅读
今年元月31日至2月16日,钱正英部长一行专程去红水河流域的广西、贵州、云南三省区视察了红水河流域正在建设的大化、岩滩、天生桥低坝和鲁布革等四座水电站,听取了有关设计院和工程局的汇报,在肯定了这几个电站取得的成绩同时,对今后工作做了指示,特别提出了对工程局和设计院改革的要求,还就如何加快红水河流域水电开发的有关问题与三省区负责同志交换了看法,并取得了一致意见。在贵州省期间,还到乌江渡、红枫、百花和东风四座水电站了解电站运
January 31 this year to February 16, Qian Zhengying and his entourage made a special trip to the Red River in Guangxi, Guizhou and Yunnan provinces and autonomous regions inspected the Red River basin is under construction Dahua, Yantan, Tianshengqiao low dam and the Lub Leather and other four hydropower stations, listened to the reports of the Design Institute and Engineering Bureau, affirmed the achievements of these several power stations at the same time, made an indication of future work, in particular, put forward the requirements of the Bureau of Engineering and Design Institute reform How to speed up the hydropower development in the Hongshui River Basin? Relevant issues have been exchanged with the responsible comrades in the three provinces and autonomous regions and have reached unanimous opinions. During the period in Guizhou Province, Wujiangdu, Hongfeng, Baihua and Dongfeng hydropower stations were also briefed on the power station operation