3000万立方米库容、3000万元投资、3个月拿出初步设计——他明知是场硬仗,但还是要打去年8月底的一天,河南省水利勘测设计院的院长找到高级工程师吴兆麟,跟他谈起胜利油田委托设计广北工业水库的事。“吴总,广北工业水库的事,想好了吗?”院长仍习惯地敬重而亲切地这样称呼他。因为吴兆麟在退居二线之前,曾任院副总工程师。院长此时实在不好启齿。1985年,院里承担了新疆一项水利工程的勘测设计任务,是院里试行技术经济责任制
30 million cubic meters of storage capacity, 30 million yuan investment, three months to come up with preliminary design - he knew it was a tough battle, but still have to fight the day of the end of August of the year, Henan Institute of Hydraulic Surveying and Design to find senior engineer Wu Zhaolin, Talk to him about the commissioned design of Shengbei Oilfield Guangbei Industrial Reservoir. “General Manager Wu, Guangbei Industrial Reservoir things, think of it? ” Dean is still used to respect and affectionately call him. Because Wu Zhaolin in retreated to second-tier, former deputy chief engineer hospital. Dean is really bad at this time. In 1985, the hospital undertook the survey and design task of a water conservancy project in Xinjiang, which was the pilot project of technical and economical responsibility in the hospital