论文部分内容阅读
在查明内蒙古巴彦淖尔市临河区水文地质条件、地下水开发及引发的环境地质问题的基础上,用均衡法及数值模拟法进行地下水资源量计算。根据当地水资源开发利用方案,利用模型进行研究区2013年-2033年地下水流场演化模拟,结果表明该方案下研究区地下水降落漏斗不再继续扩大,地下水位有所回升,对该区水资源管理有指导意义。
On the basis of ascertaining the hydrogeological conditions, the groundwater exploitation and the environmental and geological problems caused by Linhe District in Bayannur City, Inner Mongolia, the amount of groundwater resources is calculated by the equilibrium method and the numerical simulation method. According to the plan of local water resources development and utilization, the model was used to simulate the groundwater flow field evolution in the study area from 2013 to 2033. The results show that the groundwater leakage funnel in the study area under the scheme no longer continues to expand, and the groundwater level has rebounded. Management is instructive.