论文部分内容阅读
目前化探工作虽在飞跃开展,但仍远远赶不上地質工作的需要,为了更好的配合地質工作,多快好省的找出矿产资源,就必需研究如何在保証質量的前提下,加快化探工作的速度,节省化探工作的工作量。为此,我們用1958年1:2000比例尺的化探工作成果图进行了变矩形网为菱形网的試驗。其結果如图1、2所示,我們認为是能滿足地質要求的。图1为某地,該区屬四級地形,殘积坡积层在暈附近发育尚属正常,氧化还原条件較好。該矿为中溫裂隙充填之多金属矿床,以Zn最多,Pb次之,Cu更
Although geophysical exploration work is leaping forward, it is still far behind the needs of geological work. In order to better meet the geology work and find the mineral resources more efficiently and economically, it is necessary to study how to speed up the reform in the premise of ensuring the quality Explore the speed of work to save the workload of geophysical work. To this end, we use the 1958 1: 2000 scale geochemical work charts made of a rectangular network of diamond-shaped mesh test. The results shown in Figure 1,2, we believe that it can meet the geological requirements. Figure 1 is a place, which belongs to four terrains. The accumulation of residual slope is normal near halo, and the redox conditions are good. The mine is a polymetallic deposit filled with intermediate temperature fissures, Zn is the most, Pb is the second, Cu is more