论文部分内容阅读
建立社会主义市场经济,工程造价应有新的定义,它应是建设项目耗费人力、物力、财力的总和,是实物量的定义,而不是费用式定义,也不同于C+V定义。水利水电工程有其自身特点,统一对定义的认识有利于深化改革,加强管理和操作运用。从水电设备安装定额改革方面看,应改价目表式为实物量式;[86]定额应尽快补充修订;水电机组试运行费用的规定也应作适当的调整。
The establishment of a socialist market economy should have a new definition of project cost. It should be the sum of manpower, material and financial resources of construction projects. It is the definition of physical quantities, not the definition of cost and the definition of C + V. Water conservancy and hydropower projects have their own characteristics, a unified understanding of the definition is conducive to deepen the reform, strengthen management and operational use. From the point of view of hydropower equipment installation quota reform, the price list should be changed to a physical quantity type; [86] the quota should be amended as soon as possible; and the provisions for the commissioning costs of hydropower units should also be adjusted appropriately.