The primary purpose of underground gas storages is to provide gas for seasonal consumptions or strategic reserve.The periodical operations of gas injection and
Conventional methods for hollow cylinder apparatus (HCA) specimen preparation are not applicable for TJ-1 lunar soil simulant due to its wide particle size dist
The Millau viaduct over the Tarn River is an exceptional bridge considering the height under the deck and the 2.5 km total length. Each of the seven high piers
This paper is an attempt to solve the soil-pile interaction problems using the boundary element method(BEM).A computer package called PGroupN,which deals mainly