当前,建筑施工企业存在着原始记录失真的问题。主要表现在以下四个方面: (1) 运转记录失真一种情况是作为机械租赁费结算凭证时,租用单位或操作人员弄虚作假;另一种情况是不论设备使用与否或使用时间长短,随意乱写或一月填写一次。(2) 消耗记录不准配件、油料及其它消耗材料无准确记录。平时不记,大修时又多记。(3) 维修记录简单对设备停修天数、故障次数等不作详细记录,以应付承包合同规定的指标为准。维修内容与质量均无记录。
At present, there is a problem of distortion of original records in construction companies. Mainly in the following four aspects: (1) Distortion of the operation record One condition is when the rental unit or operator falsifies the machine as the mechanical rental fee settlement voucher; the other case is whether the device is used or not, or the time of use is arbitrary. Write or fill it once a month. (2) Consumption records are not accurate records of spare parts, oil and other consumables. Usually do not remember, when overhauling and more in mind. (3) The maintenance records are simple. No detailed records of equipment maintenance days, failure times, etc. shall be made in order to meet the targets specified in the contract. There is no record of maintenance content and quality.