一起锅炉水冷壁管膨胀弯曲的实例

来源 :中国锅炉压力容器安全 | 被引量 : 0次 | 上传用户:xiaohw123456
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
1 基本情况及问题 1997年11月,广东省番禺市某造纸厂对1台50t/h锅炉的全部水冷壁管(包括前、后、左、右四部分)进行更换维修。该锅炉的型号为CG—50/3.83ML。1998年2月初,在锅炉投入运行1个多月后,发现其左右水冷壁管存在严重的弯曲变形。变形主要集中在炉膛上部,大约距汽包底2~3m的位置。形状既有沿原水冷壁管位置左右弯曲的、也有沿炉膛中心方向突出弯曲的。中间位置的管子变形弧 1 Basic Information and Issues In November 1997, a paper mill in Panyu City, Guangdong Province, replaced and repaired all water wall tubes (including the front, rear, left and right sections) of a 50t / h boiler. The model of the boiler is CG-50 / 3.83ML. In early February 1998, more than a month after the boiler was put into operation, it was found that there were serious buckling deformations in the water-cooled wall tubes. Deformation is mainly concentrated in the upper furnace, about 2 ~ 3m away from the end of the drum position. Both the original shape along the original water wall tube bending position around the center, but also along the center of the furnace protruding prominent. The middle position of the tube deformation arc
其他文献
随着市场机制的不断灵活,分包管理在建设工程中越来越多,地位也越来越重要,这就对国有企业管理提出了更高的要求.分包队伍管理是否科学和规范对于国有企业实行战略化和持续性
本文是作者在近几年的工作中,根据某工程实例,对柱支式地下连续墙+喷锚支护技术在深基坑逆作法施工中的应用进行了详细的阐述和分析,较好地解决了连续墙在坚硬土层及岩层中开
2013年10月29日至11月1日,第十四届深圳安博会在深圳会展中心盛大召开,作为国内停车引导系统的开拓者和智慧停车场的缔造者,厦门科拓通讯技术股份有限公司(以下简称“科拓”)
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
一、海南省港口现状2008年全省港口拥有泊位141个(生产泊位135个,非生产泊位6个),其中万吨级以上泊位31个(其中海口4个、马村4个、洋浦14个、八所7个、三亚2个),泊位年通过能
“高速公路施工作业区交通组织和安全保障技术”项目,围绕我国高速公路施工作业区中交通安全问题展开.成果涉及施工作业区通行能力和服务水平分析评价方法、施工作业区布局优
2009年11月18日,全国环保产业协会工作会议在北京召开.中国环境保护产业协会王心芳会长出席会议并作重要讲话,各地环保产业协会有关负责同志参加会议.
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
近年来随着建筑的快速发展,房屋建筑施工技术也在不断地发展,为房屋的性能和质量提供有力保障.主要根据施工中遇到的问题,阐述房屋建筑施工中相应的实用技术,保证房屋建筑的