水利工程设计概算必须依据设计工程量、施工组织设计,按概算编制规定及概算定额进行编制。编制中常见的问题主要有:主要材料预算价格、自采砂石料单价计算不符合规定;工程单价项目标示不全及分析计算错漏;工程概算项目划分不规范、工程量计算错误或与单价不对应等。改进措施主要是转变思想观念、加强与设计专业沟通、修订概算编制规定及概算定额等。
Water conservancy project design budget estimates must be based on the amount of design work, construction design, budget preparation and budget estimates prepared by the establishment. Common problems in the preparation are: the main material budget price, since the calculation of the unit price of sand-gravel does not meet the requirements; project unit price marking incomplete analysis and calculation of errors and omissions; project budget estimates of non-standard project, the amount of engineering errors or inconsistent with the unit price . Measures for improvement mainly include changing the concept of thinking, strengthening communication with the design profession, revising the budget preparation rules and estimates, and so forth.