论文部分内容阅读
该工程建设规模为 :10× 10 4 m3/d ,工艺流程为 :取水口前池→闸室→流量计间→配水井→加药间→静态混合器井→折板反应池→平流反应池→四阀滤池→加氯间→清水池→流量计间→城市管网 ;现正由中国市政工程华北设计研究院八所进行初步设计陕西汉中石门水库供水工程$中国市
The construction scale of the project is: 10×10 4 m3/d, and the process flow is as follows: water intake pre-pool → sluice room → flow meter room → water distribution well → dosing room → static mixer well → flap reaction tank → advection reaction pool → Four-valve filter room → Chlorination room → Clear water tank → Flow meter room → Urban pipe network; Now under preliminary design by China Urban Engineering North China Design & Research Institute Eight Shaanxi Hanzhong Shimen Reservoir Water Supply Project RMB China City