上钢三厂转炉车间在1972年初,投资1300多万元,因陋就简,改造投产。车间占地100820m~2,配有3座25t氧气顶吹转炉及4座化铁炉,设计能力年产钢70万吨。由于在“文化大革命”中仓促改建,工艺和设备配套不全,加上管理混乱,使在较长一段时间内,生产与技术水平不高。1972~1976年钢的平均年产量仅63.4万吨。从1977年起,车间从实际出发,不断进行技术改造,完善设备配套,修订各项生产管理制度,使原来
On the steel plant in the first three converter workshop in early 1972, more than 1300 million yuan investment, due to simple, transformation and put into operation. The workshop covers an area of 100820m ~ 2, equipped with 3 25t oxygen top blown converter and 4 iron furnace, the design capacity of an annual output of 700,000 tons of steel. Due to the hasty rebuilding of the “Cultural Revolution”, the incomplete process and equipment, coupled with the chaotic management, the production and technical level were not high for a long period of time. From 1972 to 1976, the average annual output of steel was only 634,000 tons. From 1977 onwards, the workshop proceeded from reality, constantly carrying out technical transformation, improving equipment support, revising various production management systems so that the original