【摘 要】
:
AIM To evaluate the pharmacological effect of phosphorus-32 glass microspheres (32p-GMS) injected intothe implanted human liver cancer cell mass in nude mice.ME
【机 构】
:
Institute,2Department of Pathology
论文部分内容阅读
AIM To evaluate the pharmacological effect of phosphorus-32 glass microspheres (32p-GMS) injected intothe implanted human liver cancer cell mass in nude mice.METHODS Fifty-two Balb/c tumor loaded nude mice were allocated into treatment group (n =38) andcontrol group (n = 14), in the former group different doses of 32p-GMS were injected into the tumor mass,while in the latter group 31 P-GMS or no treatment were given instead of 32 P-GMS. After dynamicallyobserving the growth of tumor for d 3 - d 28, the experimental animals were killed in batches, the tumor andits nearby tissues were examined by light and electronic microscopy.RESULTS In comparing with the control group, the treatment group showed the tumor inhibiting rates of59.7% -93.6% (Variance analysis of the mean weight of different doses and control group after square rootcorrection, F= 579.62, P
其他文献
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
AIM To explore gallbladder circadian rhythm (GCR) and the cholagogic action of Yin Chen Hao Ta(YCHT).METHODS Ultrasonography of rabbit gallbladder at 17:00 to 1
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
AIM To study the clinical effect and mechanism of retention enema with quick-acting Kuijie powder(QAKJP) in treating chronic non-specific ulcerative colitis (CU
AIM To construct an expression vector for anti-HBsAg antibody Fab fragment and interferon-aA (IFN-aA)fusion protein in E. coli.METHODS With PCR and molecular cl
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥