国外消息七则

来源 :铁道科技动态 | 被引量 : 0次 | 上传用户:mylook1028
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
1.津巴布韦铁路1979年计划报废98台蒸汽机车,后因石油涨价,此计划终止执行,其中大部分蒸汽机车将继续运用10年。做出这种决定的另一原因是国内有Wankie大煤田,能供应大量的廉价煤。 (铁道,1980,№ 2,117) 2.美国铁路从1979年9月开始从东海岸的纽约到西海岸的洛杉矶办理驮背运输直达列车,过去这种列车每经过一个路局就要在编组站进行改编作业,走完全程需要很长时间,开行直达列车后,全程只需运行5天。 1. The Zimbabwean Railway planned to scrap 98 steam locomotives in 1979 and the project was discontinued due to oil price hikes. Most of the steam locomotives will continue to operate for 10 years. Another reason for this decision is the large Wankie coal field in the country, which supplies large amounts of cheap coal. (Railroad, 1980, № 2,117) 2. The U.S.A. railroad started direct train backpacking operations from New York on the east coast to Los Angeles on the west coast in September 1979, and was traversed by marshalling yards for each train that used to traverse the train Homework, take the whole process takes a long time, after opening the train, the entire operation only 5 days.
其他文献
国际公认的所谓72小时“黄金救援”时间早已过去,生命的奇迹却不断在那片刚刚经受了沉痛打击的土地上演——德阳汉旺镇一位被困160多个小时的幸存者获救;北川县毛坝小学3名小
据联合国统计,1980年世界10个主要国家的机车车辆出口总额为19亿8692万美元,比1979年增长12.5%,为历史上的最高记录。其中机车车辆为8亿8062万8千美元,比1979年增长3.3%;部件
在国家铁路和工厂铁路上,调车作业的合理化已成为一种提高铁路生产率的重要手段。在调车作业中所应用的机车(以下称作调车机车)对此具有重大作用。因此,调车机车必须具有高
DD-4型调度集中系统是为天津附近行车指挥自动化系统试验区段设计的,系统既要用于计算机控制还要用于人工控制。它的技术要求较高于以前设计的:DD-1,DD-2,DD-3型人工控制的系
一、水害类型和分布1981年8月21日前后,宝成线西安铁路局管内宝鸡一广元段,在346.7公里的线路上,共发生水害822处,土石方总量达183万米~3。其中,两段总长约8公里的线路被洪
请下载后查看,本文暂不支持在线获取查看简介。 Please download to view, this article does not support online access to view profile.
在铁路桥涵建设工程中,标准设计的使用率很高。中小桥和涵渠方面一般在90~95%左右,大桥设计也大部份采用标准设计。因此,大力整顿现有桥涵标准设计和广泛开展管理工作,将有重
随着信息社会化进程的加快,高校正在经历着由传统管理向数字化校园的转变。由于计算机技术、网络技术、数字技术的广泛应用,信息化已渗透到高校教学、科研、管理的方方面面,
我们始终把最不道德的东西当作优势,真正的优势却被愚昧的教育所掩盖。 We always take the most unethical things as advantages, the real advantages are covered up by
瑞典国有铁路在11,400公里的线路中有7,000公里已实现电气化并投入运营,担负着瑞典国有铁路总运量的约95%。其电流制为单相交流15千伏16~2/3赫兹。从特雷勒堡到挪威的纳尔维