论文部分内容阅读
根据太原地铁2号线小店南车辆段的功能需求、段址选择,为满足工艺要求、提高工作效率,为车辆段运用库设计此方案。
According to the functional requirements of Taiyuan Subway Line 2 Xiaodian South Depot and the site selection, in order to meet the technical requirements and improve the working efficiency, this scheme is designed for the depot utilization depot.