论文部分内容阅读
对淮钢3号高炉2005年7~12月间两次结瘤、炸瘤的情况作简要介绍,总结了3号高炉结瘤的处理方法,通过对两次结瘤的处理,优化了炉瘤处理的办法。
This paper briefly introduces the situation of nodulation and blasting of No. 2 blast furnace in Huaigang from July to December, 2005, and summarizes the treatment method of No. 3 blast furnace nodulation. Through the treatment of two nodules, The solution.