摘要:后浇带施工对于异体和大型建筑物施工有重要的作用,后浇带可以有效防止大型和异体建筑物的各组成部分出现沉降差、温度应力和伸缩量等问题,对于建筑企业来说是进行大型和异体建筑施工中必须掌握的施工技术和工艺。本文在建筑施工的实际经验基础上,对后浇带施工进行了定义,对后浇带施工中的一些重点进行了强调,并提出了高质量进行建筑工程后浇带施工的主要措施,希望对后浇带的施工和普及工作起到参考和借鉴的作用。
关键词:建筑工程;后浇带施工;定义;主要措施
Abstract: the construction of the pouring belt for foreign and large building construction has the important effect, of the pouring belt can effectively prevent and foreign building large parts of the settlement difference between appear, temperature stress and expansion amount, for the construction enterprise that is a large and foreign construction must grasp of the construction technology and process. Based on the construction of practical experience, based on the construction of the pouring belt on the definition of the pouring belt in the construction of the emphasis on some key, and put forward the high quality construction project of the pouring belt of the construction of the main measures, hope to of the pouring belt construction and popularization of a reference and the role.
Keywords: building engineering; Of the pouring belt construction; Definition; The main measures
中圖分类号: TU198 文献标识码:A 文章编号:
前言
后浇带施工是解决大型和异体建筑物建筑施工中出现沉降、温度应力和伸缩问题的主要施工方式,作为建筑企业必须控制好影响建筑工程后浇带施工的主要因素,根据工程设计的主要意图,合理设置后浇带施工的位置,严格规范施工的过程,在做好基础、模板支设、施工缝处理和养护工作,采取规范的施工工艺和方法,确保建筑工程后浇带施工的质量,实现建筑工程质量和施工进度,有效促进建筑企业经济和社会效益的实现。
1后浇带施工的概念
1.1后浇带施工的定义
后浇带施工是指在大型或者异体类的建筑施工中,为了解决大型和异体建筑物容易出现的:各部分沉降量差异、温度应力和钢筋混凝土的收缩,在整体钢筋混凝土结构中开设变形缝,根据设计和实际的要求,在一段时间后浇筑混凝土,使原结构成为连续的整体。
1.2后浇带施工的要点
首先,建筑工程后浇带施工应该保留变形缝,时间一般控制到主体结构封顶,且保留时间不少于40天。其次,建筑工程后浇带施工中应用的混凝土应该比原结构提高一个等级。最后,建筑工程后浇带施工中应该注意对钢筋的保护,在需要对钢筋进行切割时应注意对后续施工中对钢筋的焊接和加固。
2建筑工程后浇带施工的辅助工作
2.1后浇带施工中基础垫层的处理
进行建筑工程后浇带施工的前期,应该注意施工基础垫层的处理,将后浇带处垫层降低50~100毫米,在大型建筑物的施工过程中,间隔50米应该设置积水坑(池),方便处理施工缝、清理垃圾和排除雨水或养护水。
2.2后浇带施工中两侧模板的支设
进行建筑工程后浇带施工的前期,应该采用在后浇带的两侧进行钢筋支架、铅丝网和钢板网隔断,并按规定做成企口形式,也可以采用木模隔断做法,建筑工程后浇带施工时要特别注意木模同钢筋之间缝隙的控制,防治水泥砂浆的渗漏。
2.3后浇带两侧的混凝土浇筑
首先,建筑工程后浇带施工中对后浇带两侧的混凝土浇筑的厚度应严格规范,避免模板发生形变,导致混凝土结构出现偏差。其次,在垂直施工缝两侧混凝土浇筑振捣时应特别注意分层厚度、振捣器距模板的距离。最后,注意建筑工程后浇带两侧混凝土浇筑过程中振捣器材、强度和密度的选择。
2.4后浇带的防护工作
首先,在基础后浇带的两端应增设临时挡水墙,挡水墙的高度应高于底板,墙的两侧抹防水砂浆。其次,为防止后浇带周围施工用水或雨水流进后浇带内,应在后浇带的两侧设置挡水带。最后,在施工缝处理完毕并清理干净后,后浇带的顶部应用木板、模板或铁皮遮盖,并在四周设置临时栏杆进行维护。
3建筑工程后浇带施工的主要措施
3.1合理控制各种施工方式的浇筑时间
根据后浇带类型的不同合理控制浇筑时间,特别是收缩后浇带、温度后浇带应该在先期混凝土浇筑完成60天左右。
3.2做好后浇带施工缝的清洁工作
做好后浇带施工前钢筋表面锈层除锈、浮土清除和积水的排除,应该在施工缝涂刷素水泥。
3.3做好后浇带施工混凝土的选择工作
后浇带施工选用膨胀和收缩系数较小的混凝土。
3.4做好后浇带的振捣和养护工作
后浇带接缝处混凝土应搅拌均匀,认真振捣,确保密实,后浇带混凝土浇筑后应避免振动、冲击。对于大面积板面混凝土,表面抹压后用塑料薄膜覆盖,混凝土硬化后宜采用蓄水养护,也可以用湿麻袋或湿草袋覆盖,保持混凝土表面湿润。
3.5做好后浇带特殊部位的养护工作
对于墙体等不易保水的结构,宜从顶部设水管喷淋,拆模后宜用湿麻袋或湿草袋紧贴墙体覆盖,并浇水养护,保持混凝土表面湿润,冬季施工时,混凝土浇筑后要立即用塑料薄膜和保温材料覆盖,对于墙体,带模板养护时间不应少于7天。
4后浇带的施工质量控制要点
4.1板梁结构后浇带施工要点。
对于连接基础梁和上部结构的梁和板,要预留出施工后浇带,待建筑物主体完工后(有条件时再推迟一些时间),再用微膨胀混凝土将它浇筑起来,使两侧地梁、上部梁和板连接成一个整体。
4.2后浇带施工中钢筋处理的要点
其一,如果梁、板跨度不大,可一次配足钢筋。其二,如果跨度较大,可按规定断开,在补齐混凝土前焊接好。后浇带的配筋,应能承担由浇筑混凝土成为一整体后的差异沉降而产生的内力,一般可按差异沉降变形反算为内力,而在配筋上予以加强,钢筋应保证准确位置而连续不断。对于板,单层钢筋下应设置垫块,双层钢筋应设置支架,对于梁,底部钢筋亦应加垫块,上部钢筋一般直径较大,可不用支架。
4.3后浇带两侧隔断的要点
后浇带施工中一般采用钢筋支架铅丝网或单层钢板网隔断,钢筋支架的钢筋直径及间距设置视构件断面大小而定,以支撑稳定为原则,铅丝网的网眼一般不宜过大,以避免灌注混凝土时跑浆,如网眼偏大,可在网外粘贴一层塑料薄膜,待混凝土凝固后,薄膜即可撕去,钢筋支架亦可除去,而铅丝网则留在后浇带两侧,即永久留在后浇带内。
结语
综上所述,建筑工程后浇带施工中应该做到设计科学、施工规范、控制合理、工艺先进和符合实际,只有这样才能有效保证建筑工程后浇带施工的质量,确保建筑物的主体功能。作为建筑企业应该在控制好各种因素,防止建筑工程后浇带施工的质量,实现企业经济和社会效益的实现。
参考文献:
[1] 杨莉.建筑工程中的材料成本与控制[J]. 黑龙江科技信息. 2009,32.
[2] 李鸿鹏,房新民.浅析如何加强建筑工程质量的控制[J]. 黑龙江科技信息. 2010,22.
[3] 王继林.浅议某建筑工程超长结构后浇带施工技术[J]. 经营管理者. 2010,01.
[4] 王莉莎.浅谈建筑工程大体积混凝土裂缝的控制与应用[J]. 中国高新技术企业. 2008,23.
[5] 罗永校,倪国葳.浅谈建筑工程中的风险分析[J]. 科技资讯. 2009,03.
关键词:建筑工程;后浇带施工;定义;主要措施
Abstract: the construction of the pouring belt for foreign and large building construction has the important effect, of the pouring belt can effectively prevent and foreign building large parts of the settlement difference between appear, temperature stress and expansion amount, for the construction enterprise that is a large and foreign construction must grasp of the construction technology and process. Based on the construction of practical experience, based on the construction of the pouring belt on the definition of the pouring belt in the construction of the emphasis on some key, and put forward the high quality construction project of the pouring belt of the construction of the main measures, hope to of the pouring belt construction and popularization of a reference and the role.
Keywords: building engineering; Of the pouring belt construction; Definition; The main measures
中圖分类号: TU198 文献标识码:A 文章编号:
前言
后浇带施工是解决大型和异体建筑物建筑施工中出现沉降、温度应力和伸缩问题的主要施工方式,作为建筑企业必须控制好影响建筑工程后浇带施工的主要因素,根据工程设计的主要意图,合理设置后浇带施工的位置,严格规范施工的过程,在做好基础、模板支设、施工缝处理和养护工作,采取规范的施工工艺和方法,确保建筑工程后浇带施工的质量,实现建筑工程质量和施工进度,有效促进建筑企业经济和社会效益的实现。
1后浇带施工的概念
1.1后浇带施工的定义
后浇带施工是指在大型或者异体类的建筑施工中,为了解决大型和异体建筑物容易出现的:各部分沉降量差异、温度应力和钢筋混凝土的收缩,在整体钢筋混凝土结构中开设变形缝,根据设计和实际的要求,在一段时间后浇筑混凝土,使原结构成为连续的整体。
1.2后浇带施工的要点
首先,建筑工程后浇带施工应该保留变形缝,时间一般控制到主体结构封顶,且保留时间不少于40天。其次,建筑工程后浇带施工中应用的混凝土应该比原结构提高一个等级。最后,建筑工程后浇带施工中应该注意对钢筋的保护,在需要对钢筋进行切割时应注意对后续施工中对钢筋的焊接和加固。
2建筑工程后浇带施工的辅助工作
2.1后浇带施工中基础垫层的处理
进行建筑工程后浇带施工的前期,应该注意施工基础垫层的处理,将后浇带处垫层降低50~100毫米,在大型建筑物的施工过程中,间隔50米应该设置积水坑(池),方便处理施工缝、清理垃圾和排除雨水或养护水。
2.2后浇带施工中两侧模板的支设
进行建筑工程后浇带施工的前期,应该采用在后浇带的两侧进行钢筋支架、铅丝网和钢板网隔断,并按规定做成企口形式,也可以采用木模隔断做法,建筑工程后浇带施工时要特别注意木模同钢筋之间缝隙的控制,防治水泥砂浆的渗漏。
2.3后浇带两侧的混凝土浇筑
首先,建筑工程后浇带施工中对后浇带两侧的混凝土浇筑的厚度应严格规范,避免模板发生形变,导致混凝土结构出现偏差。其次,在垂直施工缝两侧混凝土浇筑振捣时应特别注意分层厚度、振捣器距模板的距离。最后,注意建筑工程后浇带两侧混凝土浇筑过程中振捣器材、强度和密度的选择。
2.4后浇带的防护工作
首先,在基础后浇带的两端应增设临时挡水墙,挡水墙的高度应高于底板,墙的两侧抹防水砂浆。其次,为防止后浇带周围施工用水或雨水流进后浇带内,应在后浇带的两侧设置挡水带。最后,在施工缝处理完毕并清理干净后,后浇带的顶部应用木板、模板或铁皮遮盖,并在四周设置临时栏杆进行维护。
3建筑工程后浇带施工的主要措施
3.1合理控制各种施工方式的浇筑时间
根据后浇带类型的不同合理控制浇筑时间,特别是收缩后浇带、温度后浇带应该在先期混凝土浇筑完成60天左右。
3.2做好后浇带施工缝的清洁工作
做好后浇带施工前钢筋表面锈层除锈、浮土清除和积水的排除,应该在施工缝涂刷素水泥。
3.3做好后浇带施工混凝土的选择工作
后浇带施工选用膨胀和收缩系数较小的混凝土。
3.4做好后浇带的振捣和养护工作
后浇带接缝处混凝土应搅拌均匀,认真振捣,确保密实,后浇带混凝土浇筑后应避免振动、冲击。对于大面积板面混凝土,表面抹压后用塑料薄膜覆盖,混凝土硬化后宜采用蓄水养护,也可以用湿麻袋或湿草袋覆盖,保持混凝土表面湿润。
3.5做好后浇带特殊部位的养护工作
对于墙体等不易保水的结构,宜从顶部设水管喷淋,拆模后宜用湿麻袋或湿草袋紧贴墙体覆盖,并浇水养护,保持混凝土表面湿润,冬季施工时,混凝土浇筑后要立即用塑料薄膜和保温材料覆盖,对于墙体,带模板养护时间不应少于7天。
4后浇带的施工质量控制要点
4.1板梁结构后浇带施工要点。
对于连接基础梁和上部结构的梁和板,要预留出施工后浇带,待建筑物主体完工后(有条件时再推迟一些时间),再用微膨胀混凝土将它浇筑起来,使两侧地梁、上部梁和板连接成一个整体。
4.2后浇带施工中钢筋处理的要点
其一,如果梁、板跨度不大,可一次配足钢筋。其二,如果跨度较大,可按规定断开,在补齐混凝土前焊接好。后浇带的配筋,应能承担由浇筑混凝土成为一整体后的差异沉降而产生的内力,一般可按差异沉降变形反算为内力,而在配筋上予以加强,钢筋应保证准确位置而连续不断。对于板,单层钢筋下应设置垫块,双层钢筋应设置支架,对于梁,底部钢筋亦应加垫块,上部钢筋一般直径较大,可不用支架。
4.3后浇带两侧隔断的要点
后浇带施工中一般采用钢筋支架铅丝网或单层钢板网隔断,钢筋支架的钢筋直径及间距设置视构件断面大小而定,以支撑稳定为原则,铅丝网的网眼一般不宜过大,以避免灌注混凝土时跑浆,如网眼偏大,可在网外粘贴一层塑料薄膜,待混凝土凝固后,薄膜即可撕去,钢筋支架亦可除去,而铅丝网则留在后浇带两侧,即永久留在后浇带内。
结语
综上所述,建筑工程后浇带施工中应该做到设计科学、施工规范、控制合理、工艺先进和符合实际,只有这样才能有效保证建筑工程后浇带施工的质量,确保建筑物的主体功能。作为建筑企业应该在控制好各种因素,防止建筑工程后浇带施工的质量,实现企业经济和社会效益的实现。
参考文献:
[1] 杨莉.建筑工程中的材料成本与控制[J]. 黑龙江科技信息. 2009,32.
[2] 李鸿鹏,房新民.浅析如何加强建筑工程质量的控制[J]. 黑龙江科技信息. 2010,22.
[3] 王继林.浅议某建筑工程超长结构后浇带施工技术[J]. 经营管理者. 2010,01.
[4] 王莉莎.浅谈建筑工程大体积混凝土裂缝的控制与应用[J]. 中国高新技术企业. 2008,23.
[5] 罗永校,倪国葳.浅谈建筑工程中的风险分析[J]. 科技资讯. 2009,03.