论文部分内容阅读
1994年我县引入了桃树“长枝修剪”技术,经过3年的实践获得了成功,实现了一年栽树,二年见果,三年丰产的效果,比传统的修剪方法亩增产300公斤。现就桃树长枝修剪介绍如下: 1.长征修剪的栽植同传统的修剪法 2.长枝修剪的土肥水管理 由于长枝修剪后树体的叶面积大、水分蒸腾加大,在果树管理期间,尤其是果实迅速增大期,应较使用传统修剪方法修剪的树增加施肥量、施肥次数、灌水次数,即必须配合于良好
In 1994, the county introduced the peach tree “long branch pruning” technology, after three years of practice was successful, achieved a year planting trees, fruit see two years, three years of high yield results, than the traditional method of pruning acre yield 300 kg. The introduction of peach long branch pruning are as follows: 1. Long March pruning planting with the traditional pruning method 2. Pruning of pruning of soil and fertilizer water management As the pruning of tree body leaf area, water transpiration increased in fruit tree management During the period, especially when the fruit is rapidly growing, the amount of fertilizer applied, the number of fertilizations and the number of times of irrigation should be increased compared with trees pruned using traditional pruning methods, that is, they must be well matched