摘 要:水利水电工程,是现如今推动社会发展的重要动力,能够提供较多的资源,且还可能够实现对水资源的有效利用,并起到抗洪防涝的作用,对于社会可持续发展使十分重要,需要施工单位结合实际情况来对施工环节进行合理化设计,保证水利水电工程的施工质量。该文将结合实际情况,对水利水电施工中施工导流和围堰技术进行详细分析,以期为今后开展的有关工作提供宝贵参考。
关键词:水利水电工程 施工导流 围堰技术 运用
中图分类号:TV551 文献标识码:A 文章编号:1672-3791(2020)07(b)-0066-03
Application of Construction Diversion and Cofferdam Technology in Water Conservancy and Hydropower Construction
CHEN Li
(Mianyang Polytechnic, Mianyang, Sichuan Province, 621000 China)
Abstract: Water Conservancy and hydropower engineering is an important driving force to promote social development, which can provide more resources, and can also realize the effective use of water resources, and play a role in flood control and waterlogging prevention. It is very important for the sustainable development of society. The construction unit is required to carry out a reasonable design of the construction link in combination with the actual situation to ensure the construction quality of water conservancy and hydropower engineering Quantity. In this paper, combined with the actual situation, the construction diversion and cofferdam technology in water conservancy and hydropower construction will be analyzed in detail, in order to provide valuable reference for the future work.
Key Words: Water conservancy and hydropower engineering; Construction diversion; Cofferdam technology; Application
水利水电工程就是为了保证电力充足、水资源有效控制而存在的,其施工质量对于发电、防洪防涝有着重要影响。其中,施工导流、围堰技术就是较常会应用到的技术手段,关系到工程整体质量。因此,从实际角度出发对施工导流与围堰技术的运用进行详细分析是十分必要的。
1 水利水电施工导流的划分原则
1.1 导流技术
导流技术是指采用相应措施,将活水与施工现场分隔开。通过导流技术,可以改善施工环境,并且能够改变河道。既有助于保障施工质量,也有助于提升施工效率。导流技术通常都会应用在河流的枯水期,在河流枯水期进行围堰工作,是水利水电施工的重要组成部分,会对施工质量和施工效率产生直接的影响。
1.2 划分原則
水利水电施工过程中,需要提前制订导流方案,而制订导流方案应结合基坑施工的具体工程量,同时还应根据施工现场情况等设计导流方案。如果基坑施工的工程量较大,而会导致水利水电工程难以在截流后的一个枯水期完工,因此,制订导流方案便需要结合全年标准进行设计。针对那些未能完成的石坝,需要施工单位采用相应的防控措施,避免出现溢流现象。如果基坑施工的工程量较小,则基本可以在截流后的一个枯水期完成施工,因此,在设计导流方案的过程中,应结合枯水期的和流量进行设计。除此之外,在设计导流方案时,还应结合施工的具体要求合理选择围堰技术,这样才能保障水利水电工程施工的顺利开展,提升施工质量与施工效率[1]。
2 施工导流在水利水电施工中的应用
施工导流主要是指,在兴修水利水电工程时,为了避免出现在湿地上施工的情况,就需要利用导流技术,保证施工区域的干燥性,借此来提高施工质量,避免受地质因素影响,而出现施工质量不达标的情况。目前,在水利水电工程施工中,主要应用到的施工导流技术有以下几种。
2.1 全段式围堰导流技术
这种导流技术,主要是指通过建筑围堰,来截断全部的河床,使得水流能够根据预期设计的要求,流淌到指定的位置,属于一种一次性施工方式。在应用这种使用技术时,施工人员必须要考虑到应用场景以及周围环境的问题,只有在能够满足全段式围堰导流技术特殊性时,才可以充分发挥该项技术的积极作用。目前,在流速较快的水域,或者是基坑小的水利水电施工中,可以应用这一项技术,并能够起到较好的效果,在保证水流可以按照预定方向流淌到指定位置,避免对工程施工造成影响,也有助于提升工程施工质量[2]。 2.2 分段式围堰导流技术
分段式围堰导流技术是一种与全段式导流技术相对的技术类型,并不是一次性就可以完成所有工程施工项目,需要施工人员在河床、大坝或者是一些其他建筑工程明显制约下,所采用的导流形式。根据现如今技术应用形式来看,其主要是被应用于一些规模较大的河床上,通过这种方式来减少水利水电工程的建设压力,为后续工程施工营造出良好的工程环境[3]。这种施工形式对于施工人员的技术有着较高的要求,为了更为精准地完成施工项目,技术人员必须要实现做好数据采集工作,然后以数据为基础,来对整体施工进行合理规划,对技术困难部分进行有效讨论,保证分段围堰施工的有效性。
3 围堰技术在水利水电施工中的应用
围堰主要是指在水利水电工程中,为了保证施工的顺利完成,打造永久性水利水电工程设施,修建一些临时性的维护结构,防止水、土以及或者其他与建筑建设无关的元素进入施工现场,为围堰内的排水工作、基坑挖掘、建筑物修建奠定基础。在进入正式施工阶段以前,还需要做好一系列参数测试,并对围堰平面进行分析与设置,对技术的具体应用进行选择,确保施工符合具体水利工程的要求。目前,在实际施工中所应用到的主要技术应用有3种。
3.1 混凝土围堰技术的应用
混凝土本身就具有极高的强度,具有防渗性特点,可以较好地承受水流对围堰造成的冲击。因此,这一技术也是现阶段围堰施工中经常会应用到的,十分常见,对于延长施工寿命可以起到一定作用;也可以将不同年代建设的水利工程连接在一起,确保整个区域范围内的水利水电工程更为连贯,满足当前时代发展需求[4]。需要注意的是,在实际施工中,施工人员必须要保证混凝土搅拌均匀,连续灌注,做好后续的养护工作,保证围堰施工的有效性。
3.2 木板桩围堰技术的应用
水利水电工程往往会面临着较多不同的地形,施工单位必须要根据地质、地势的实际情况,来选择合理的围堰施工形式。木板桩围堰技术,也是实际施工中较常会应用到的技术手段与形式,主要是针对浅、小基坑而采取的有效手段,利用顺槽与木板桩之间建立联系,防止水的渗透。水流较浅的区域可以利用单层木板,而深水区域则是可以利用双层木板结构,提高内部支撑于承载力,保证围堰工程的稳定性[5]。
3.3 土石围堰技术的应用
若是从严格意义上进行划分,土石围堰技术分为两种过水土石与不过水土石围堰这两种技术。在实际施工中,这种围堰技术能够最大程度上降低成本,原材料可以就地取材,运输成本相对较低。虽然,这种类型围堰,无法与混凝土围堰的强度相提并论,但是整体结构简单、易拆除、易改造,适合被应用于一些平缓水流的围堰施工中,避免因水流强度过大而出现围堰坍塌的情况,保证水利水电施工顺利完成。其中,过水土石围堰技术所选用的导流方案需要把基坑进行淹没,确保堰体过水的安全,对于过水环节,则运用科学对策减低水流对堰体导致的冲击影响,规避产生下游边坡与堰顶一起滑动的现象。针对过水土石围堰来说,涵盖了混凝土板围堰,把混凝土面板覆盖至下游的大坝坡面上,虽然此种形式所制造的护面防水性能良好,不过依然应该加强对面板接缝位置的防水处理。而对于不过水土石围堰来说,此类围堰结构与土石大坝近似,进行施工的过程中,可以得到相关土石材料,降低工程项目的经济成本,不必运用先进的技术便能够进行拆除,依靠众多的优点,让其获得了良好的应用效果。不过,此类围堰构造形式同样有缺陷:工程量和沉陷量较大、水无法没过堰顶等[6]。
4 围堰的平面布置及堰顶高程
4.1 围堰的平面布置
结合水利水电工程的排水设施以及施工模板进行围堰平面布置,同时,还应考虑到工程建筑轮廓以及交通通道等方面的因素。通常来讲,应注重把控水利水电基坑横向坡址与建筑轮廓之间的距离,要使二者的距离在20m以上。与此同时,还应注重把控基坑纵向坡址与建筑轮廓之间的距离,要使二者的距离小于2m。为保障水利水电工程的安全性,需要注重围堰的水平布置。通常情况下,在对围堰平面布置的过程中,会结合围堰的类型以及具体的导流方案等方面的因素,提升围堰平面布置的科学性与安全性。
4.2 确定堰顶高程
在水利水电工程施工过程中,近年来主要会采用粘土心墙防渗式土石围堰作为施工导流工程的围堰建筑。所以应结合有关规定,在静水位60cm处设计防渗体,以此来保护围堰。确定堰顶高程以及围堰位置,在实际的工作过程中,应结合围堰顶部防护结构的厚度、水位的壅高以及堰体施工沉降量等因素,这样才能保障堰顶高程的合理性。
5 结语
综上所述,在科技时代背景下,社会发展必须要依靠能源来实现,尤其是电力资源更是保证社会生产力的重要前提与条件。这也就使得如何保证电力充足、提高发电效率成为有关部门所需要考虑的一个重要问题。因此,在今后施工单位必须要采取有效措施,应用施工导流、围堰技术,使其积极作用可以充分发挥,提高水利水电工程质量。
参考文献
[1] 刘伟萍.试论水利水电施工中导流和围堰技术的运用[J].中国科技投资,2019(20):46.
[2] 王庭棟.浅谈水利水电施工中施工导流和围堰技术的运用[J].商品与质量,2019(21):282.
[3] 杜磊,董育武,谢军.关于水利工程施工导流及围堰技术的应用分析[J].城市建设理论研究,2018(31):131.
[4] 刘金利.水利水电施工中施工导流和围堰技术的运用[J].区域治理,2018(34):216.
[5] 李磊.水利水电施工中施工导流和围堰技术的应用[J].水能经济,2018(1):205.
[6] 侯建秀.水利水电工程施工导流方案决策研究[J].水利技术监督,2017,25(6):148-150.
关键词:水利水电工程 施工导流 围堰技术 运用
中图分类号:TV551 文献标识码:A 文章编号:1672-3791(2020)07(b)-0066-03
Application of Construction Diversion and Cofferdam Technology in Water Conservancy and Hydropower Construction
CHEN Li
(Mianyang Polytechnic, Mianyang, Sichuan Province, 621000 China)
Abstract: Water Conservancy and hydropower engineering is an important driving force to promote social development, which can provide more resources, and can also realize the effective use of water resources, and play a role in flood control and waterlogging prevention. It is very important for the sustainable development of society. The construction unit is required to carry out a reasonable design of the construction link in combination with the actual situation to ensure the construction quality of water conservancy and hydropower engineering Quantity. In this paper, combined with the actual situation, the construction diversion and cofferdam technology in water conservancy and hydropower construction will be analyzed in detail, in order to provide valuable reference for the future work.
Key Words: Water conservancy and hydropower engineering; Construction diversion; Cofferdam technology; Application
水利水电工程就是为了保证电力充足、水资源有效控制而存在的,其施工质量对于发电、防洪防涝有着重要影响。其中,施工导流、围堰技术就是较常会应用到的技术手段,关系到工程整体质量。因此,从实际角度出发对施工导流与围堰技术的运用进行详细分析是十分必要的。
1 水利水电施工导流的划分原则
1.1 导流技术
导流技术是指采用相应措施,将活水与施工现场分隔开。通过导流技术,可以改善施工环境,并且能够改变河道。既有助于保障施工质量,也有助于提升施工效率。导流技术通常都会应用在河流的枯水期,在河流枯水期进行围堰工作,是水利水电施工的重要组成部分,会对施工质量和施工效率产生直接的影响。
1.2 划分原則
水利水电施工过程中,需要提前制订导流方案,而制订导流方案应结合基坑施工的具体工程量,同时还应根据施工现场情况等设计导流方案。如果基坑施工的工程量较大,而会导致水利水电工程难以在截流后的一个枯水期完工,因此,制订导流方案便需要结合全年标准进行设计。针对那些未能完成的石坝,需要施工单位采用相应的防控措施,避免出现溢流现象。如果基坑施工的工程量较小,则基本可以在截流后的一个枯水期完成施工,因此,在设计导流方案的过程中,应结合枯水期的和流量进行设计。除此之外,在设计导流方案时,还应结合施工的具体要求合理选择围堰技术,这样才能保障水利水电工程施工的顺利开展,提升施工质量与施工效率[1]。
2 施工导流在水利水电施工中的应用
施工导流主要是指,在兴修水利水电工程时,为了避免出现在湿地上施工的情况,就需要利用导流技术,保证施工区域的干燥性,借此来提高施工质量,避免受地质因素影响,而出现施工质量不达标的情况。目前,在水利水电工程施工中,主要应用到的施工导流技术有以下几种。
2.1 全段式围堰导流技术
这种导流技术,主要是指通过建筑围堰,来截断全部的河床,使得水流能够根据预期设计的要求,流淌到指定的位置,属于一种一次性施工方式。在应用这种使用技术时,施工人员必须要考虑到应用场景以及周围环境的问题,只有在能够满足全段式围堰导流技术特殊性时,才可以充分发挥该项技术的积极作用。目前,在流速较快的水域,或者是基坑小的水利水电施工中,可以应用这一项技术,并能够起到较好的效果,在保证水流可以按照预定方向流淌到指定位置,避免对工程施工造成影响,也有助于提升工程施工质量[2]。 2.2 分段式围堰导流技术
分段式围堰导流技术是一种与全段式导流技术相对的技术类型,并不是一次性就可以完成所有工程施工项目,需要施工人员在河床、大坝或者是一些其他建筑工程明显制约下,所采用的导流形式。根据现如今技术应用形式来看,其主要是被应用于一些规模较大的河床上,通过这种方式来减少水利水电工程的建设压力,为后续工程施工营造出良好的工程环境[3]。这种施工形式对于施工人员的技术有着较高的要求,为了更为精准地完成施工项目,技术人员必须要实现做好数据采集工作,然后以数据为基础,来对整体施工进行合理规划,对技术困难部分进行有效讨论,保证分段围堰施工的有效性。
3 围堰技术在水利水电施工中的应用
围堰主要是指在水利水电工程中,为了保证施工的顺利完成,打造永久性水利水电工程设施,修建一些临时性的维护结构,防止水、土以及或者其他与建筑建设无关的元素进入施工现场,为围堰内的排水工作、基坑挖掘、建筑物修建奠定基础。在进入正式施工阶段以前,还需要做好一系列参数测试,并对围堰平面进行分析与设置,对技术的具体应用进行选择,确保施工符合具体水利工程的要求。目前,在实际施工中所应用到的主要技术应用有3种。
3.1 混凝土围堰技术的应用
混凝土本身就具有极高的强度,具有防渗性特点,可以较好地承受水流对围堰造成的冲击。因此,这一技术也是现阶段围堰施工中经常会应用到的,十分常见,对于延长施工寿命可以起到一定作用;也可以将不同年代建设的水利工程连接在一起,确保整个区域范围内的水利水电工程更为连贯,满足当前时代发展需求[4]。需要注意的是,在实际施工中,施工人员必须要保证混凝土搅拌均匀,连续灌注,做好后续的养护工作,保证围堰施工的有效性。
3.2 木板桩围堰技术的应用
水利水电工程往往会面临着较多不同的地形,施工单位必须要根据地质、地势的实际情况,来选择合理的围堰施工形式。木板桩围堰技术,也是实际施工中较常会应用到的技术手段与形式,主要是针对浅、小基坑而采取的有效手段,利用顺槽与木板桩之间建立联系,防止水的渗透。水流较浅的区域可以利用单层木板,而深水区域则是可以利用双层木板结构,提高内部支撑于承载力,保证围堰工程的稳定性[5]。
3.3 土石围堰技术的应用
若是从严格意义上进行划分,土石围堰技术分为两种过水土石与不过水土石围堰这两种技术。在实际施工中,这种围堰技术能够最大程度上降低成本,原材料可以就地取材,运输成本相对较低。虽然,这种类型围堰,无法与混凝土围堰的强度相提并论,但是整体结构简单、易拆除、易改造,适合被应用于一些平缓水流的围堰施工中,避免因水流强度过大而出现围堰坍塌的情况,保证水利水电施工顺利完成。其中,过水土石围堰技术所选用的导流方案需要把基坑进行淹没,确保堰体过水的安全,对于过水环节,则运用科学对策减低水流对堰体导致的冲击影响,规避产生下游边坡与堰顶一起滑动的现象。针对过水土石围堰来说,涵盖了混凝土板围堰,把混凝土面板覆盖至下游的大坝坡面上,虽然此种形式所制造的护面防水性能良好,不过依然应该加强对面板接缝位置的防水处理。而对于不过水土石围堰来说,此类围堰结构与土石大坝近似,进行施工的过程中,可以得到相关土石材料,降低工程项目的经济成本,不必运用先进的技术便能够进行拆除,依靠众多的优点,让其获得了良好的应用效果。不过,此类围堰构造形式同样有缺陷:工程量和沉陷量较大、水无法没过堰顶等[6]。
4 围堰的平面布置及堰顶高程
4.1 围堰的平面布置
结合水利水电工程的排水设施以及施工模板进行围堰平面布置,同时,还应考虑到工程建筑轮廓以及交通通道等方面的因素。通常来讲,应注重把控水利水电基坑横向坡址与建筑轮廓之间的距离,要使二者的距离在20m以上。与此同时,还应注重把控基坑纵向坡址与建筑轮廓之间的距离,要使二者的距离小于2m。为保障水利水电工程的安全性,需要注重围堰的水平布置。通常情况下,在对围堰平面布置的过程中,会结合围堰的类型以及具体的导流方案等方面的因素,提升围堰平面布置的科学性与安全性。
4.2 确定堰顶高程
在水利水电工程施工过程中,近年来主要会采用粘土心墙防渗式土石围堰作为施工导流工程的围堰建筑。所以应结合有关规定,在静水位60cm处设计防渗体,以此来保护围堰。确定堰顶高程以及围堰位置,在实际的工作过程中,应结合围堰顶部防护结构的厚度、水位的壅高以及堰体施工沉降量等因素,这样才能保障堰顶高程的合理性。
5 结语
综上所述,在科技时代背景下,社会发展必须要依靠能源来实现,尤其是电力资源更是保证社会生产力的重要前提与条件。这也就使得如何保证电力充足、提高发电效率成为有关部门所需要考虑的一个重要问题。因此,在今后施工单位必须要采取有效措施,应用施工导流、围堰技术,使其积极作用可以充分发挥,提高水利水电工程质量。
参考文献
[1] 刘伟萍.试论水利水电施工中导流和围堰技术的运用[J].中国科技投资,2019(20):46.
[2] 王庭棟.浅谈水利水电施工中施工导流和围堰技术的运用[J].商品与质量,2019(21):282.
[3] 杜磊,董育武,谢军.关于水利工程施工导流及围堰技术的应用分析[J].城市建设理论研究,2018(31):131.
[4] 刘金利.水利水电施工中施工导流和围堰技术的运用[J].区域治理,2018(34):216.
[5] 李磊.水利水电施工中施工导流和围堰技术的应用[J].水能经济,2018(1):205.
[6] 侯建秀.水利水电工程施工导流方案决策研究[J].水利技术监督,2017,25(6):148-150.