论文部分内容阅读
从1985年我国引进现代筑坝技术建设混凝土面板堆石坝至今已30余年。据统计,截至2015年底,我国坝高30m以上混凝土面板堆石坝已建约270座,在建约60座,规划建设约80座,总数超过400座。我国面板堆石坝几乎遍布全国,数量占全球面板堆石坝总数的一半以上。中国混凝土面板堆石坝在设计、施工、科研、监测和恶劣自然条件建坝等方面积累了丰富的经验,技术难度、工程规模、最大坝高等均处于世界前列,坝体变形控制、渗流控制、面板防裂等方面也取得了瞩目的成就,筑坝技
Since 1985, China has introduced modern dam technology to build concrete faced rockfill dam has been more than 30 years. According to statistics, as of the end of 2015, there are about 270 concrete faced rockfill dam dam above 30m in China, about 60 under construction, about 80 planned construction and a total number of over 400. China’s rockfill dam almost all over the country, the number of the total number of global panel rockfill dam more than half. China’s concrete faced rockfill dam has accumulated rich experience in design, construction, scientific research, monitoring and dam construction under adverse natural conditions. The technical difficulty, the project scale and the maximum dam height are at the forefront in the world. The dam deformation control, seepage control, Panel crack, etc. also made remarkable achievements, dam technology