论文部分内容阅读
通过对高压旋喷桩的试验研究,解决处理由动力机器基础振动引起排架柱基础不均匀沉降的事故,为加固设计提供依据。
Through the experimental study of high-pressure jet grouting piles, the accidents caused by the foundation vibration of the power machine caused by the uneven foundation settlement of the truss columns are solved and the basis for the reinforcement design is provided.