论文部分内容阅读
安徽省金寨县麒麟河水电站装机2×1600kW,由于土建施工和主机部分存在的缺陷,给机组安装造成困难,本文对几个主要问题及处理对策作一简要介绍,为其它小水电机组的安装提供借鉴。
The installation of 2 × 1600kW of Qilin River Hydropower Station in Jinzhai County, Anhui Province, due to the defects of civil construction and main engine parts, posed difficulties to the installation of the unit. In this paper, a brief introduction to several major issues and treatment measures is provided for the installation of other small hydropower units Provide reference.