论文部分内容阅读
文章以1-2-1亭的设计与建造过程为例,从概念提出、结构融合、具体实施、细节处理等角度阐释了在当代环境中建筑-结构整合设计的可能性,并讨论了一种以模糊而不是清晰的方式来介入建筑设计各层面的思考方式。
Taking the design and construction process of 1-2-1 pavilion as an example, the article expounds the possibility of building-structure integration design in contemporary environment from the aspects of concept introduction, structure integration, implementation and detail processing. Intervene in ways of thinking at all levels of architectural design in a vague rather than clear way.