【摘 要】
:
The preliminary design for the BRIF project has received the official approval in 2010. The engineering design schematics of key systems have been completed and
【出 处】
:
Annual Report of China Institute of Atomic Energy
论文部分内容阅读
The preliminary design for the BRIF project has received the official approval in 2010. The engineering design schematics of key systems have been completed and their main components are being constructed and proceeding smoothly. Along with the finalization of cooling circuit number and the power
The preliminary design for the BRIF project has received the official approval in 2010. The engineering design schematics of key systems have been completed and their main components are being constructed and proceeding smoothly. Along with the finalization of cooling circuit number and the power
其他文献
我们常说:学高为师,身正为范;为人师表,教书育人。在学校的教育教学工作中,教师的职业素养起着至关重要的作用。我认为英语教师的专业素质应涵盖以下几个方面:学科教学能力、
由中国原子能科学研究院于中国同位素有限公司共同出资建造的303热室改扩建工程(钴源封装热室)于2012年1月6日通过由中核集团公司组织的竣工验收。303热室改扩建工程隶属国家
1.引言水轮机调速器主要完成机组的频率调节及有功负荷的调整.但在具体实现中,常规调速器只能按照开度的调节变化来达到对有功功率的控制,这种开环的控制方式精度差、效率低.
社会现代化程度的不断提高,导致水资源的严重污染,所以地下水潜力评价已成为现代水文事业的一个重要话题.目前,地下水资源评价的理论已经基本成熟,主要采用的方法有均衡法,数
基于5SDH-2串列加速器建立压水堆安全壳外模拟中子参考辐射场,主要装置之一是加速器中子源,以D(d,n)反应产生的5MeV中子作为加速器中子源,需制作氘气体靶。气体靶与固体靶相
前不久,在庆祝2020年中国农民丰收节——农垦“喜丰收奔小康”暨“智慧农垦万里行”活动上,《农垦粳稻谷》《农垦粳米》以及配套的《农垦稻谷储运技术规范》和《农垦稻米加工
1.前言作为水力发电工程,从选址方案阶段,通过经济比较,都会把挡水建筑物布置于河床两岸陡峭的“V”形山谷中,从而决定了枢纽系统的配套建筑物也会布置于高山峡谷中,而建筑物
今年3月起,产自河北张家口市怀安县的黄瓜、青椒等优质大棚蔬菜相继上市,不但满足了当地“菜篮子”,还走上了北京人的餐桌.rn“俺们过去只能种玉米、小米和土豆,自从东西部协
A preliminary study was made on the antibacterial behavior of a newly designed Cu-bearing type 200 stainless steel by different methods including Vickers hardne
高效课堂,是通过有效的课堂教学手段来达成教学目的的课堂.随着网络的发展,信息化教学不断发展,成为教学的重要方法之一,其生动有趣的教学形式,激发了学生的学习兴趣,有效提