摘要: 房地产开发企业对工程成本造价的控制就是在满足企业设定的目标成本内,在项目质量合格标准的前提下,把各个成本项目支出都控制在目标成本设定的限额内。施工阶段是资金投入的最大阶段,是招投标工作的延伸,是合同的具体化,是项目实物实施阶段。在施工阶段就是对建筑安装成本进行目标控制。本文从分析建设项目施工阶段造价失控的原因,以及施工阶段造价控制有效的途径着手,来确保项目施工阶段成本目标的实现。
关键词: 工程成本造价的控制 全员经济意识有效途径
Abstract: real estate development enterprises to control the engineering cost is to meet the target cost in the business enterprise within the set, in the premise of project quality standards, the cost control in the target cost setting limits. The construction phase is the biggest stage of investment, is the extension of bidding work, is a specific contract, is the real implementation stage. In the construction stage is to control the construction and installation cost. This paper analyzes the reasons of cost control in the construction stage of construction project cost control in the construction stage, and effective way to proceed, to achieve the cost target in the project construction stage.
Keywords: cost effective way of full economic consciousness of engineering cost control
中图分类号: TU723.3 文献标识码:A 文章编号:2095-2104(2013)
房地产开发项目各个阶段一般包括投资决策阶段(市场调查、项目定位、购置土地)、勘察设计阶段、建设准备阶段(招投标阶段)、施工阶段、竣工结算阶段、后评估阶段
一般来说,房地产企业从购地后开始项目建设到房屋竣工交房具有周期长、生产要素价格變化频繁、产品单件性、固定性等特征,使得建设工程施工阶段的造价复杂多变,在工程施工阶段,由于工程设计已经完成,工程量已完全具体化,并完成了施工招标工作和签订了工程承包合同,节约投资的可能性已经很小,但是,工程投资却主要发生在这一阶段。目前有许多建设项目在投资的施工实施阶段是造价失控浪费的、其原因如下
建设项目施工阶段造价失控的原因:
1、合同条款欠严密
施工合同是发包人和承包人为完成商定的建安工程,明确相互权利、义务和责任关系的合同。施工合同是工程建设项目的主要合同,是工程建设质量、进度、投资三方面控制的主要依据。一个完整、科学、合理的施工合同具体内容均体现在与工程造价有关的信息,包括合同文件的组成与解释顺序,具体、明确的工程实施范围,工程数量,总造价的组成,计费方式及费率,浮动率,工程款的支付方式,工程的变更、签证等规定,工程结算、工期、质量的约定,检测、检验费,索赔、风险责任,保险,甲供材料和设备,分包工程等等。上述各项内容如稍有不明确或确定不合理,即可对造价造成很大影响。
2、施工组织设计的编制考虑不周全,特别是一些总平面布置不合理,场内各个施工单位的场地分配不科学,有些引起很多二次搬运费等等。
最优的施工组织设计应该是结合工程自身特点明确施工进度的关键线路,顺利的衔接各个节点,高质量高效率的完成施工务。但有时高质量高效率和造价却是矛盾的。施工组织设计不应单纯从技术可行性角度考虑,应做到在满足技术可行性的同时,还要结合施工可行性,经济适用性。
3、设计变更手续办理不及时因设计变更是施工过程中非常重要的一道管理程序,
针对合同条款,对施工过程中涉及到工程量增加新增工程项目施工条件环境的改变业主或地方政府等原因引起的施工费用增加等都应及时办理相关的变更签认手续,保留影像资料等,从而为索赔或调概做好准备,规范全理地规避企业风险。这也是避免工程造价失控的一项重要内容。
4、施工现场管理松散、结算混乱由于有关管理人员责任心不强,业务水平不高,缺乏有效的监督管理制度,致使现场管理混乱,签认的原始数据没有合理性,从而造成工程决算不准确、成本不实,效益流失,造价失控。
5、单方面缩短合同工期及提高质量标准
目前有些工程项目在已签订的合同中对工期及质量已有明确要求,但施工中由于因开发企业单方面原因要求将合同工期提前、质量标准提高,也是造成工程造价失控的原因之一。有时开发商由于变更因素经常要求施工方抢工,从而增加费用。
6、进度款支付拖欠、不全额给付
目前有很多开发企业对按照合同节点的进度款是缓给,不全额给付,拖欠比较严重,拖欠世间长了后造成工程停工,建设时间延长,有可能引起施工索赔和不按实交房等产生索赔等更大的风险。
因此,通过以上对建设项目施工阶段造价失控的原因具体分析列举,在实践中往往把施工阶段作为工程造价控制的重要阶段。施工阶段工程造价控制的主要任务是通过工程付款控制、工程变更费用控制并处理好费用索赔、挖掘节约工程造价潜力以实现实际发生的费用不超过计划投资。房地产开发企业在施工阶段对工程造价的管理除了加强合同管理、工程进度款管理外,重点应加强工程施工现场管理,杜绝投资浪费。
施工阶段成本造价控制的方法较多,其有效的途径可以从以下几个方面着手,确保项目成本目标的实现。
一、加强各部门参与提高全员经济意识
成本控制决不单纯是工程核算人员、财务人员的任务,也不仅仅是财务部门和项目部的事,而是全体建设参加者的共同任务。成本控制要做到全员参与,树立全员经济意识。而如何树立全员经济意识正是现在施工单位急需解决的一个问题。
在施工阶段要加强设计、工程、成本部门之间的共同协调控制成本,制定成本控制目标,推行责任成本,加强对发生的增加成本事项的评估考核机制
可以由部门经理与上级领导签订责任书,明确自己在工程施工过程中遇到不同情况时所应承担的责任。然后,在项目部内部层层分解责任,层层分解责任成本,层层签订责任书。最后,对于具体考核措施,可以在项目部内部成立一个考核小组,在每道工序完成后,根据项目部内部成员责任目标完成情况,进行商议考核。
二、加强合同管理、减少工程索赔
1 、施工合同是施工阶段造价控制的依据。签订严密的施工合同,同时在施工中加强合同管理,才能保证合同造价的合理性、合法性,减少在合同的履行过程中发生纠纷,维护合同双方利益,有效地控制工程造价。
2 、做好合同会签及审批制度。施工合同内容广泛,涉及施工技术经济法律等多方面知识,在合同为正式签订前,由各专业部门共同研究。提出对合同条款的具体意见,进行会签。实行会签制度,能够确保合同全面及实际的履行。通过严格的审查批准手续,可以是签订的合同合法有效尽量防止合同纠纷的发生,减少索赔事件产生的因素。在合同签订后要做好合同文件的管理工作。补充合同、重要的工地会议纪要、工地联系单等作为合同内容的一种延伸和解释,必须完整保存,同时建立技术档案,加强资料管理必须重视。
3 、施工前,应组织施工合同交底会议。相关管理人员,须将本工程中标方式、清单组价的依据、利润降点系数等有关工程造价控制方面的信息及时准确地传达。熟悉和掌握相关的施工合同文件是工程造价管理的前提。
4、合同履行过程中的管理。加强合同的跟踪管理,做好工程施工记录和日程的文件资料的积累工作,根据合同正确处理索赔,达到有效控制投资的目的。
5、合同管理的后评估制度。对合同管理制度从合法性、规范性、实用性、系统性及科学性等方面进行评估,发现和解决合同履行中的问题,不断完善合同管理。
三、 优化施工组织设计
1、 充分做好施工准备工作。在收到中标通知后,施工单位应着手编制详尽的施工组织设计。由于工程开工前的一系列准备工作可以采用不同的方法去完成,不论在技术方面或者组织方面,通常都有许多方案供施工人员选择。不同的施工方案,其经济效果是不同的。工程管理人员应结合工程项目的性质、规模、工期、劳动力数量、机械装备程度、材料供应情况、运输条件、地质条件等各项具体的技术经济条件,对施工组织设计、施工方案、施工进度计划进行优化,提出改进意见,使方案更趋合理。
2、 遵循均衡原则安排施工进度。在编制施工进度计划时,应按照工程项目合理的施工程序排列施工的先后顺序,根据施工情况划分施工阶段,安排流水作业,避免工作过分集中,有目的地削减高峰期工作量,减少临时设施的搭设,避免劳动力、材料、机械耗用量大进大出,保证施工过程按计划、有节奏地进行。
3、 力求提高施工机械利用率。在工程施工中,主要施工机械利用率的高低,直接影响工程成本和施工进度。因此,必须充分利用现有机械设备,在不影响工程总进度的前提下,对进度计划进行合理调整,以便提高主要施工机械的利用率,从而达到降低工程成本的目的。
4、 施工方法、施工技术的采用以简化工序、提高经济效益为原则。在保证工程质量的前提下,尽量采用成熟的施工方法,采用简化工序和提高经济效益的施工技术。因为成熟的施工方法只要提出要求,施工人员不需要花更多的时间去掌握它。简化工序的施工技术即节约了时间,也达到了提高劳动生产率的目的。
四、材料使用和管理
工程直接成本主要是指在施工项目成本形成过程中直接构成工程实体和有助于工程形成的人工费、材料费、机械使用费及其他直接费用,其中材料成本约占工程总成本的60%左右,因此材料成本的控制是工程项目成本造价控制的关键。材料成本的控制以下方面。
加强对甲供材的确定和管理,考虑资金、时间价值,减少资金占用,合理确定进货批量和批次,尽可能降低材料储备。
严格对乙方供应的材料核价管理:第一,加强对买价的控制。通过市行情的调查研究,在保质保量的前提下,货比三家,加强材料设备的战約供应商的建立和管理。
五、严格控制工程变更与现场签证。
在工程项目的实施过程中,由于建设单位、设计、施工等方面的原因。常常会出现工程量、材料、施工进度等变化。导致工程费用发生改变,因此,应该加强对工程变更与现场签证的审核。
1、 工程变更的原因。开发企业对建设工程提出新的要求。例如,修改项目总计划;削减预算;更换不同材质的门窗等。由于设计上的错误,必须对设计图纸作修改。由于使用新技术,有必要改变原设计、原施工方案。由于施工现场的环境发生了变化,预定的工程条件不准确。政府部门对建设项目有新的要求,如环境保护要求,城市规划要求等。以上情况导致变更的产生。
2、 工程变更中应注意的问题。第一,工程师的认可权应合理限制。常常通过工程师对材料的认可权,提高材料的质量标准;对设计的认可权,提高设计质量标准;对施工认可权提高施工质量标准。企业对超出合同规定的要求应通过一定程序并取得企业书面确认,施工方因为这些变更能都产生工期和额外费用的索赔要及时准确提出开发商要及时审核和判断必要时也可以反索赔。第二,工程变更不能超过合同规定的工程范围。工程变更决对不能超出合同规定的工程范围。如果超过了这个范围,承包商有权不执行变更或坚持先商定价格后再进行变更。第三,承包商不能擅作主张进行工程变更。对任何工程问题,承包商不能自作主张,进行工程变更。
3、对签证事项的审核时,应严格审查签证事项发生的内容、原因、范围、价格、明确费用发生的承担方,如果该签证事项的发生时由于承包商的原因造成的或已包含在合同价款中,应予注明。并要规范现场签证,详细说明签证事项产生的原因、时间、处理的办法等内容,不要是配以简图和文字说明。
六、加强工程进度款的及时全额支付
按照合同约定,在到达工程支付节点后开发商要及时审核工程进度和拨付工程款。偶尔延后支付是也告知施工方做好协商解釋工作,且做好书面记录,避免万一产生付款索赔而没有留证据而发生费用的风险。
七、加强工程工期质量和进度的管理
要监督施工方质量要达到一次行合格,由于施工方由于管理不善引起的返工费用一般是施工方自行解决,但有时也会返工造成工期延长,进度滞后 。有些质量不合格可能是甲方和监理监督不到位造成的从而加大成本支出。如在基础施工中由于甲方管理人员不作为没有时时现场控制和对土石方的抽检经常出现施工方超挖深的现象。
八、加强安全文明施工管理,杜绝发生安全事故,也可以避免因发生安全事故引起的甲方赔偿责任。
九、加强企业的廉政制度建设,企业应提高企业员工主人翁思想意思,员工要以企业就是自己家。并加强廉政制度建设,建立一套严格的反腐倡廉保证体系。杜绝在施工中甲方工作人员收红包现象,以致在项目实施中随意下令改变设计标准、不作为、引起索赔给企业造成经济损失。
综上所述,工程施工项目的成本控制在整个项目目标管理体系中处于十分重要的地位,工程项目的成本控制的好坏,直接影响到工程利润的高低。只有在工程施工中全方位、全过程严格把关,才能做好工程施工项目的成本控制工作,使企业在激烈的市场竞争条件下站稳脚跟。
参考文献:
[1]王占红李立红:影响工程造价的主要因素及控制[J].中国科技信息,2006(19)
[2]舒怀珠等:建设工程项目实施阶段的造价控制[J].中国水运(理论版),2006(5)
[3]焦天磊. 工程项目造价管理全过程管理与控制[J].甘肃科技纵横,2009,(3).
[4]何上福. 工程项目造价管理及造价控制探讨[J]. 管理工程学报,2005,(S1).
[5]魏瑞丽,王雪鹏. 建筑工程项目造价管理探讨[J]. 才智,2011,(19).
关键词: 工程成本造价的控制 全员经济意识有效途径
Abstract: real estate development enterprises to control the engineering cost is to meet the target cost in the business enterprise within the set, in the premise of project quality standards, the cost control in the target cost setting limits. The construction phase is the biggest stage of investment, is the extension of bidding work, is a specific contract, is the real implementation stage. In the construction stage is to control the construction and installation cost. This paper analyzes the reasons of cost control in the construction stage of construction project cost control in the construction stage, and effective way to proceed, to achieve the cost target in the project construction stage.
Keywords: cost effective way of full economic consciousness of engineering cost control
中图分类号: TU723.3 文献标识码:A 文章编号:2095-2104(2013)
房地产开发项目各个阶段一般包括投资决策阶段(市场调查、项目定位、购置土地)、勘察设计阶段、建设准备阶段(招投标阶段)、施工阶段、竣工结算阶段、后评估阶段
一般来说,房地产企业从购地后开始项目建设到房屋竣工交房具有周期长、生产要素价格變化频繁、产品单件性、固定性等特征,使得建设工程施工阶段的造价复杂多变,在工程施工阶段,由于工程设计已经完成,工程量已完全具体化,并完成了施工招标工作和签订了工程承包合同,节约投资的可能性已经很小,但是,工程投资却主要发生在这一阶段。目前有许多建设项目在投资的施工实施阶段是造价失控浪费的、其原因如下
建设项目施工阶段造价失控的原因:
1、合同条款欠严密
施工合同是发包人和承包人为完成商定的建安工程,明确相互权利、义务和责任关系的合同。施工合同是工程建设项目的主要合同,是工程建设质量、进度、投资三方面控制的主要依据。一个完整、科学、合理的施工合同具体内容均体现在与工程造价有关的信息,包括合同文件的组成与解释顺序,具体、明确的工程实施范围,工程数量,总造价的组成,计费方式及费率,浮动率,工程款的支付方式,工程的变更、签证等规定,工程结算、工期、质量的约定,检测、检验费,索赔、风险责任,保险,甲供材料和设备,分包工程等等。上述各项内容如稍有不明确或确定不合理,即可对造价造成很大影响。
2、施工组织设计的编制考虑不周全,特别是一些总平面布置不合理,场内各个施工单位的场地分配不科学,有些引起很多二次搬运费等等。
最优的施工组织设计应该是结合工程自身特点明确施工进度的关键线路,顺利的衔接各个节点,高质量高效率的完成施工务。但有时高质量高效率和造价却是矛盾的。施工组织设计不应单纯从技术可行性角度考虑,应做到在满足技术可行性的同时,还要结合施工可行性,经济适用性。
3、设计变更手续办理不及时因设计变更是施工过程中非常重要的一道管理程序,
针对合同条款,对施工过程中涉及到工程量增加新增工程项目施工条件环境的改变业主或地方政府等原因引起的施工费用增加等都应及时办理相关的变更签认手续,保留影像资料等,从而为索赔或调概做好准备,规范全理地规避企业风险。这也是避免工程造价失控的一项重要内容。
4、施工现场管理松散、结算混乱由于有关管理人员责任心不强,业务水平不高,缺乏有效的监督管理制度,致使现场管理混乱,签认的原始数据没有合理性,从而造成工程决算不准确、成本不实,效益流失,造价失控。
5、单方面缩短合同工期及提高质量标准
目前有些工程项目在已签订的合同中对工期及质量已有明确要求,但施工中由于因开发企业单方面原因要求将合同工期提前、质量标准提高,也是造成工程造价失控的原因之一。有时开发商由于变更因素经常要求施工方抢工,从而增加费用。
6、进度款支付拖欠、不全额给付
目前有很多开发企业对按照合同节点的进度款是缓给,不全额给付,拖欠比较严重,拖欠世间长了后造成工程停工,建设时间延长,有可能引起施工索赔和不按实交房等产生索赔等更大的风险。
因此,通过以上对建设项目施工阶段造价失控的原因具体分析列举,在实践中往往把施工阶段作为工程造价控制的重要阶段。施工阶段工程造价控制的主要任务是通过工程付款控制、工程变更费用控制并处理好费用索赔、挖掘节约工程造价潜力以实现实际发生的费用不超过计划投资。房地产开发企业在施工阶段对工程造价的管理除了加强合同管理、工程进度款管理外,重点应加强工程施工现场管理,杜绝投资浪费。
施工阶段成本造价控制的方法较多,其有效的途径可以从以下几个方面着手,确保项目成本目标的实现。
一、加强各部门参与提高全员经济意识
成本控制决不单纯是工程核算人员、财务人员的任务,也不仅仅是财务部门和项目部的事,而是全体建设参加者的共同任务。成本控制要做到全员参与,树立全员经济意识。而如何树立全员经济意识正是现在施工单位急需解决的一个问题。
在施工阶段要加强设计、工程、成本部门之间的共同协调控制成本,制定成本控制目标,推行责任成本,加强对发生的增加成本事项的评估考核机制
可以由部门经理与上级领导签订责任书,明确自己在工程施工过程中遇到不同情况时所应承担的责任。然后,在项目部内部层层分解责任,层层分解责任成本,层层签订责任书。最后,对于具体考核措施,可以在项目部内部成立一个考核小组,在每道工序完成后,根据项目部内部成员责任目标完成情况,进行商议考核。
二、加强合同管理、减少工程索赔
1 、施工合同是施工阶段造价控制的依据。签订严密的施工合同,同时在施工中加强合同管理,才能保证合同造价的合理性、合法性,减少在合同的履行过程中发生纠纷,维护合同双方利益,有效地控制工程造价。
2 、做好合同会签及审批制度。施工合同内容广泛,涉及施工技术经济法律等多方面知识,在合同为正式签订前,由各专业部门共同研究。提出对合同条款的具体意见,进行会签。实行会签制度,能够确保合同全面及实际的履行。通过严格的审查批准手续,可以是签订的合同合法有效尽量防止合同纠纷的发生,减少索赔事件产生的因素。在合同签订后要做好合同文件的管理工作。补充合同、重要的工地会议纪要、工地联系单等作为合同内容的一种延伸和解释,必须完整保存,同时建立技术档案,加强资料管理必须重视。
3 、施工前,应组织施工合同交底会议。相关管理人员,须将本工程中标方式、清单组价的依据、利润降点系数等有关工程造价控制方面的信息及时准确地传达。熟悉和掌握相关的施工合同文件是工程造价管理的前提。
4、合同履行过程中的管理。加强合同的跟踪管理,做好工程施工记录和日程的文件资料的积累工作,根据合同正确处理索赔,达到有效控制投资的目的。
5、合同管理的后评估制度。对合同管理制度从合法性、规范性、实用性、系统性及科学性等方面进行评估,发现和解决合同履行中的问题,不断完善合同管理。
三、 优化施工组织设计
1、 充分做好施工准备工作。在收到中标通知后,施工单位应着手编制详尽的施工组织设计。由于工程开工前的一系列准备工作可以采用不同的方法去完成,不论在技术方面或者组织方面,通常都有许多方案供施工人员选择。不同的施工方案,其经济效果是不同的。工程管理人员应结合工程项目的性质、规模、工期、劳动力数量、机械装备程度、材料供应情况、运输条件、地质条件等各项具体的技术经济条件,对施工组织设计、施工方案、施工进度计划进行优化,提出改进意见,使方案更趋合理。
2、 遵循均衡原则安排施工进度。在编制施工进度计划时,应按照工程项目合理的施工程序排列施工的先后顺序,根据施工情况划分施工阶段,安排流水作业,避免工作过分集中,有目的地削减高峰期工作量,减少临时设施的搭设,避免劳动力、材料、机械耗用量大进大出,保证施工过程按计划、有节奏地进行。
3、 力求提高施工机械利用率。在工程施工中,主要施工机械利用率的高低,直接影响工程成本和施工进度。因此,必须充分利用现有机械设备,在不影响工程总进度的前提下,对进度计划进行合理调整,以便提高主要施工机械的利用率,从而达到降低工程成本的目的。
4、 施工方法、施工技术的采用以简化工序、提高经济效益为原则。在保证工程质量的前提下,尽量采用成熟的施工方法,采用简化工序和提高经济效益的施工技术。因为成熟的施工方法只要提出要求,施工人员不需要花更多的时间去掌握它。简化工序的施工技术即节约了时间,也达到了提高劳动生产率的目的。
四、材料使用和管理
工程直接成本主要是指在施工项目成本形成过程中直接构成工程实体和有助于工程形成的人工费、材料费、机械使用费及其他直接费用,其中材料成本约占工程总成本的60%左右,因此材料成本的控制是工程项目成本造价控制的关键。材料成本的控制以下方面。
加强对甲供材的确定和管理,考虑资金、时间价值,减少资金占用,合理确定进货批量和批次,尽可能降低材料储备。
严格对乙方供应的材料核价管理:第一,加强对买价的控制。通过市行情的调查研究,在保质保量的前提下,货比三家,加强材料设备的战約供应商的建立和管理。
五、严格控制工程变更与现场签证。
在工程项目的实施过程中,由于建设单位、设计、施工等方面的原因。常常会出现工程量、材料、施工进度等变化。导致工程费用发生改变,因此,应该加强对工程变更与现场签证的审核。
1、 工程变更的原因。开发企业对建设工程提出新的要求。例如,修改项目总计划;削减预算;更换不同材质的门窗等。由于设计上的错误,必须对设计图纸作修改。由于使用新技术,有必要改变原设计、原施工方案。由于施工现场的环境发生了变化,预定的工程条件不准确。政府部门对建设项目有新的要求,如环境保护要求,城市规划要求等。以上情况导致变更的产生。
2、 工程变更中应注意的问题。第一,工程师的认可权应合理限制。常常通过工程师对材料的认可权,提高材料的质量标准;对设计的认可权,提高设计质量标准;对施工认可权提高施工质量标准。企业对超出合同规定的要求应通过一定程序并取得企业书面确认,施工方因为这些变更能都产生工期和额外费用的索赔要及时准确提出开发商要及时审核和判断必要时也可以反索赔。第二,工程变更不能超过合同规定的工程范围。工程变更决对不能超出合同规定的工程范围。如果超过了这个范围,承包商有权不执行变更或坚持先商定价格后再进行变更。第三,承包商不能擅作主张进行工程变更。对任何工程问题,承包商不能自作主张,进行工程变更。
3、对签证事项的审核时,应严格审查签证事项发生的内容、原因、范围、价格、明确费用发生的承担方,如果该签证事项的发生时由于承包商的原因造成的或已包含在合同价款中,应予注明。并要规范现场签证,详细说明签证事项产生的原因、时间、处理的办法等内容,不要是配以简图和文字说明。
六、加强工程进度款的及时全额支付
按照合同约定,在到达工程支付节点后开发商要及时审核工程进度和拨付工程款。偶尔延后支付是也告知施工方做好协商解釋工作,且做好书面记录,避免万一产生付款索赔而没有留证据而发生费用的风险。
七、加强工程工期质量和进度的管理
要监督施工方质量要达到一次行合格,由于施工方由于管理不善引起的返工费用一般是施工方自行解决,但有时也会返工造成工期延长,进度滞后 。有些质量不合格可能是甲方和监理监督不到位造成的从而加大成本支出。如在基础施工中由于甲方管理人员不作为没有时时现场控制和对土石方的抽检经常出现施工方超挖深的现象。
八、加强安全文明施工管理,杜绝发生安全事故,也可以避免因发生安全事故引起的甲方赔偿责任。
九、加强企业的廉政制度建设,企业应提高企业员工主人翁思想意思,员工要以企业就是自己家。并加强廉政制度建设,建立一套严格的反腐倡廉保证体系。杜绝在施工中甲方工作人员收红包现象,以致在项目实施中随意下令改变设计标准、不作为、引起索赔给企业造成经济损失。
综上所述,工程施工项目的成本控制在整个项目目标管理体系中处于十分重要的地位,工程项目的成本控制的好坏,直接影响到工程利润的高低。只有在工程施工中全方位、全过程严格把关,才能做好工程施工项目的成本控制工作,使企业在激烈的市场竞争条件下站稳脚跟。
参考文献:
[1]王占红李立红:影响工程造价的主要因素及控制[J].中国科技信息,2006(19)
[2]舒怀珠等:建设工程项目实施阶段的造价控制[J].中国水运(理论版),2006(5)
[3]焦天磊. 工程项目造价管理全过程管理与控制[J].甘肃科技纵横,2009,(3).
[4]何上福. 工程项目造价管理及造价控制探讨[J]. 管理工程学报,2005,(S1).
[5]魏瑞丽,王雪鹏. 建筑工程项目造价管理探讨[J]. 才智,2011,(19).