本文结合FIDIC条款及公路工程合同条件对公路工程费用监理中的重点和难点——工程变更合同支付项目进行了全面的分析。并对费用控制中重点和难点的操作提出处理意见,以控制工程费用。
Based on the FIDIC clauses and the contract conditions of highway engineering, this paper analyzes the key and difficult points in highway project cost supervising - the project of contract payment for alteration. And put forward handling opinions on the key and difficult operations in the cost control so as to control the construction cost.