膀胱原发性印戒细胞癌二例报告并文献复习

来源 :中华肿瘤防治杂志 | 被引量 : 0次 | 上传用户:qwertasdfg122
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
1病例报告例1:患者男,69岁。因间断性肉眼血尿2个月于2008-06入我院就诊,无尿频、尿急和尿痛,无腹痛、里急后重和血便,无发热。体检无阳性体征。B超提示膀胱右侧壁2 cm×3 cm实质性占位,突入膀胱,右肾、输尿管积水;腹部CT示,膀胱右侧壁实质性占位,侵犯肌层,右肾、输尿管积水,肝胆胰脾未见明显异常。血常规、生 1 Case Report Example 1: Male patient, 69 years old. Due to intermittent gross hematuria 2 months in 2008-06 into our hospital, no urinary frequency, urgency and dysuria, no abdominal pain, tenesmus and bloody stools, no fever. No physical examination positive signs. B ultrasound prompted the right side wall of the bladder 2 cm × 3 cm substantial occupancy, broke into the bladder, right kidney, ureteral hydronephrosis; abdominal CT showed that the right side of the bladder substantial occupying, invasion of muscle, right kidney, ureteral hydronephrosis , Hepatobiliary and pancreatic spleen no obvious abnormalities. Blood routine, students
其他文献
我国现如今的大型建筑工程施工过程中,已经逐渐开始选择EPC总承包施工模式.施工单位在投标活动中中标以后,便需要从施工实况出发,综合分析施工环境、施工技术、管理模式、施
【摘要】对于建筑物质量,预制装配式建筑物的结构设计的很重要。特别是随着建筑业的快速发展,对质量和实用性的要求可以说越来越严格。预制装配式建筑物的结构设计增强了工程施工的安全性,同时提高了建筑项目质量,在一定程度上实现了节约能源和充分执行减排的技術要求。因此预制装配式建筑物的结构设计对关键技术要求非常严格。当前装配式结构建筑必须突破传统概念的局限性,迎接新时代到来的发展挑战,专注于关键的施工技术的提
【摘要】随着我国经济的快速发展,我国的建筑工程行业也跟着城市的建设得到飞速的发展 。人们的生活水平不断提高,对建筑行业施工的管理也提出新的要求。 造价管理是一项复杂多变的系统工程,如果不能对整个项目进行有效的管理和控制 ,那么整个工程的质量和进度就不能得到保证。所以,建筑工程施工建设的全过程都应该进行造价的控制,并进行全过程造价的措施。本文通过对建筑工程管理全过程造价控制的重要意义进行分析,这样可
PPP项目主要是指政府资金为主要融资模式的全新建筑工程形式,通过政府和社会共同承担风险责任,可以保证建筑工程的资本利用效率全面增强,而且还可以对建筑工程不同的造价阶段