中天建设集团有限公司是中天控股集团的旗舰企业,以房屋建筑、基础设施建设为主要经营业务。其承接的天津永利大厦项目位于天津市河西区,总建筑面积约8.4万m~2。地上由两栋百米酒店式公寓和一栋9层商业裙房组成,地下为3层整体地下车库。针对传统的项目管理模式所带来的施工工艺复杂,交底困难、措施管理混乱,材料用量无法得到把控、信息采集不够及时、工程问题具体情况反馈存在偏差、相关人员
Zhongtian Construction Group Co., Ltd. is the flagship enterprise of Zhongtian Holding Group and mainly engaged in building construction and infrastructure construction. The Tianjin Yongli Building Project undertaken by it is located in Hexi District, Tianjin with a total gross floor area of about 84,000 m 2. The ground consists of two 100-meter hotel-style apartments and a 9-storey commercial podium, the ground floor for the three-story underground garage. In view of the complicated construction process brought by the traditional project management mode, the difficulties in handling construction, the disorderly management of measures, the inability to control the amount of materials used, the lack of timely information collection, and the feedback on the specific conditions of engineering problems, the related personnel