论文部分内容阅读
水电机电安装工程是水力发电工程的一部份,它包括水工金属结构、水轮发电机组、电气设备和其它附属设备的安装调试,以及与安装相联系的工作。水力发电工程的特点,受汛期及洪水制约,投资多,建设周期长。机电安装工程是在土建工程初具规模,即在发电前两三年才有的工程。此时有多个工种协同作业,要相互配合才能保持整个工程连续进展,土建与安装有一方因故停顿即有可能影响另一方工作。这一阶段又是施工最紧张阶段,人们常称之为“抢发电时
Hydropower Mechatronics Installation is part of a hydropower project that includes the installation and commissioning of hydraulic metal structures, hydroelectric generating sets, electrical equipment and other ancillary equipment, as well as installation-related work. The characteristics of hydropower projects, flood season and flood control, investment, long construction period. Mechanical and electrical installation project is beginning to take shape in civil engineering, that is, only two or three years before the power generation project. At this time there are multiple types of work in collaboration, to cooperate with each other in order to maintain continuous progress of the entire project, civil construction and installation of a pause for any reason that may affect the other side of the work. This stage is the most intense phase of construction, people often call it "grab power generation