循环流化床锅炉高温过热器的优化设计

来源 :电力建设 | 被引量 : 0次 | 上传用户:liu1513
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
目前 ,高温、高压循环流化床锅炉高温过热器都采用常规布置方式 ,高温过热器上部受热面的材料必须采用SA2 13-T9l,它价格昂贵、加工工艺复杂 ,使高温过热器的造价较高。为此 ,提出了高温过热器的优化布置方案 ,此方案比常规布置方案更经济 ,使高温过热器受热面价格仅为常规布置方案的 80 %。因此 ,优化布置方案应在高温、高压循环流化床锅炉高温过热器布置中推广使用。 At present, the high temperature, high pressure circulating fluidized bed boiler high temperature superheater are used conventional arrangement, the material of the upper heating surface of the high temperature superheater must be SA2 13-T9l, it is expensive, complex processing technology, high temperature superheater cost . Therefore, the optimal arrangement scheme of high temperature superheater is proposed, which is more economical than the conventional arrangement scheme, so that the heating surface price of high temperature superheater is only 80% of the conventional arrangement scheme. Therefore, the optimized layout scheme should be popularized in the arrangement of high temperature and high pressure circulating fluidized bed boiler high temperature superheater.
其他文献
我国压力容器无损检测标准JB4 730— 94规定的标准反射体有长横孔和短横孔 2种试块 ,2种试块对超声波反射规律的研究表明 ,由此可能引起对缺陷评定的矛盾 ,因此 ,2种试块并存
21世纪是知识经济加速发展的时代,也是终身学习、建设学习型社会的时代,学会认知、学会自主学习是学习者适应社会发展的有效途径之一,可以使成人学习者最大限度地发挥其潜能、展
目前,采用传统的电网短路电流计算方法,只能求得注入故障节点的短路电流,这在工程上使用常感不便.变结构电网短路电流计算方法通过改变短路点的结构,能够直接求出在设备(如断
分宜发电有限公司安装了我国第1台自行研制、具有自主知识产权的大型循环流化床锅炉.在投运过程中暴露了不少问题,如堵煤、排渣困难、风机出力过大等.针对存在的问题,各单位
主变中性点经小电抗接地与直接接地相比,在电力系统发生接地短路故障时,接地短路电流幅值变小;保护装置安装处的零序电压3U0有变化;如果小电抗阻抗角与主变阻抗角不一致,零序