江都水利枢纽工程,位于江都市城区南郊,在京杭大运河、新通扬运河和淮河人江尾闾芒稻河的交汇处。从1961年年底开始兴建江都第一抽水站,到1977年春第四抽水机站建成,江都水利枢纽工程先后花了16年时间。四座抽水站共装大型立式轴流泵机组33台,设备总容量49800千瓦。设计抽水能力400m~3/秒,连同备机总抽水能力473m~3/秒。它与五座大型水闸、七座中型水闸、两座船闸、两个涵洞、两条鱼道以及输变电工程和引排河道,组成了一个能灌溉、排涝、泄洪、通航、过鱼、发电的大型水利
Jiangdu Water Conservancy Project, located in the southern suburbs of Jiangdu City, in the Beijing-Hangzhou Grand Canal, the new Tongyang Canal and Huaihe River at the junction of Manao River. Starting from the end of 1961, Jiangdu first pumping station was built and the fourth pumping station was completed in the spring of 1977. The Jiangdu Water Control Project took 16 years. The four pumping stations have a total of 33 large-scale vertical axial-flow pump units with a total capacity of 49,800 kilowatts. Design pumping capacity of 400m ~ 3 / s, together with the preparation of the total pumping capacity of 473m ~ 3 / sec. It consists of five large sluices, seven medium-sized sluices, two locks, two culverts, two fish tracks, power transmission and transformation projects, and drainage of river courses to form an irrigation, drainage, flood discharge, navigation, over-fishing, power generation Large water conservancy