第一章总则第一条:黄河下游复堤土方工程中新修土堤及旧堤之加高、培厚、戗堤与修筑坝基等,均应依照本规范的要求办理。第二条:土方工程施工时,应根据所制定的设计文件为准。第三条:土方工程施工前应在沿堤附近
Chapter I General Provisions Article 1: The height, thickness, embankment and dam foundation of newly-built earthworks and old embankments in the embankment of the lower Yellow River should be handled in accordance with the requirements of this code. Article 2: Construction of earthwork should be based on the design documents developed shall prevail. Article 3: Earthworks should be constructed along the embankment before construction