论文部分内容阅读
总结杭甬运河65m单跨混凝土系杆拱桥的拱肋与吊杆吊装的施工操作技术,详细介绍主拱支架搭设、吊装技术、施工过程监控方法等工序,为以后施工类似工程提供参考
The construction technique of hoisting the arch rib and boom of the 65m single-span concrete tied arch bridge in Hangzhou-Ningbo Canal is summarized. The steps of erecting and lifting the main arch support, the monitoring method of the construction process are introduced in detail, which can provide reference for similar projects in the future.