论文部分内容阅读
通过介绍一起高铁接触网分相隔离开关误动故障分析和验证过程,找到误动问题原因。针对目前接触网开关运行问题,从结构设计优化、技术管理、安全管理等方面提出安全控制措施。
By introducing a high-speed rail contact with the phase separation switch malfunctioning fault analysis and verification process to find the cause of the problem. Aiming at the problem of switch operation at present, the safety control measures are put forward from the aspects of structural design optimization, technical management and safety management.