2005年国家重点建设项目确定电力项目52项

来源 :现代电力 | 被引量 : 0次 | 上传用户:lxting86
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
7月底,国家发展改革委印发2005年国家重点建设项目名单,共有145个项目,其中电力项目52项(名单见下表)。52项国家重点电力建设项目1.长江三峡工程:枢纽及移民工程;送出工程2.青海黄河公伯峡水电站3.广西龙滩水电站4.云南澜沧江小湾水电站5.湖北水布垭水电站6.浙江桐柏抽水蓄能电 By the end of July, the National Development and Reform Commission issued a list of the state key construction projects in 2005 with a total of 145 projects, of which 52 were power projects (the list is shown in the following table). 52 national key power construction projects 1. Three Gorges Project of Yangtze River: hub and resettlement project; sending out project 2. Qinghai Yellow River Gongboxia Hydropower Station 3. Guangxi Longtan Hydropower Station 4. Yunnan Lancang River Xiaowan Hydropower Station 5. Hubei Shuibuya Hydropower Station Zhejiang Tongbai pumped storage power
其他文献
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
The control of time delay systems is still an open area for research. This paper proposes an enhanced model predictive discrete-time sliding mode control with a
A robust sliding mode approach combined with a field oriented control (FOC) for induction motor (IM) speed control is presented. The proposed sliding mode contr
This paper is concerned with the problem of the full-order observer design for a class of fractional-order Lipschitz nonlinear systems. By introducing a continu
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
A position/force hybrid control system based on impedance control scheme is designed to align a small gripper to a special ring object. The vision information provided by microscope vision system is u
The paper considers certain impedimental issues related to the use of magnetic gearbox and magnetic coupling technologies in high performance servo control syst
This paper deals with the problem of designing a robust discrete output-feedback based repetitive-control system for a class of linear plants with periodic unce
In this paper, an adaptive type-2 fuzzy sliding mode control to tolerate actuator faults of unknown nonlinear systems with external disturbances is presented. B
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥