摘要:现浇型钢筋混凝土楼屋面板裂缝是建筑工程中常见的一项质量问题,它不但影响建筑施工的速度,还对建筑物的使用寿命造成影响,是应该引起建筑业的高度重视。本文从建筑施工的实际工作出发,描述了现浇钢筋混凝土楼面裂缝出现的原因,提出了防治现浇钢筋混凝土楼面裂缝的办法,希望对现浇钢筋混凝土楼面裂缝的防治起到参考和借鉴的作用。
关键词:楼面裂缝; 混凝土; 振捣; 养护
Abstract: the cast-in-situ reinforced concrete LouWu panel type of fracture is common in construction engineering a quality problem, it not only affect the speed of building construction, but also the service life of the buildings to affect, and it should be cause the attention of the construction industry. This paper, from the construction of the actual conditions, describes the cast-in-place reinforced concrete floor cracks reasons, puts forward the control cast-in-place reinforced concrete floor to the cracks, and I hope to cast-in-place reinforced concrete floor crack preventing a reference for the role.
Keywords: floor crack; Concrete; Vibrating; maintenance
中图分类号:TU37文献标识码:A 文章编号:
前言:现浇钢筋混凝土楼屋面板出现裂缝,是目前建筑业常见且难于彻底解决的难题之一,特别是在裂缝产生后,必然导致施工工期的延误、工程甲乙双方的纠纷、建筑物使用功能的降低以及建筑物使用寿命的缩短等不良后果。作为建筑业的从业人员应该清楚现浇钢筋混凝土楼面裂缝产生的原因,强化建筑设计、施工和养护阶段对现浇钢筋混凝土楼面裂缝的控制,做好现浇钢筋混凝土楼面裂缝的防控工作。接下来本文就针对现浇钢筋混凝土楼面裂缝的成因进行分析,对现浇钢筋混凝土楼面裂缝的防治要点进行探讨,希望可以起到一定的前期探索的作用。
1 现浇钢筋混凝土楼面裂缝的成因分析
1.1 在建筑施工的设计阶段,其一,忽视了混凝土在温度的影响下发生收缩和硬化时的自收缩,导致配置钢筋数量和强度不适合实际情况,产生楼面裂缝。其二,在设计建筑物的阳角、剪力墙和梁体时由于从设计缺乏对混凝土的自由形变,引起在实际施工中出现45 度的楼面裂缝。
1.2在建筑施工阶段外墙转角部位的放射形钢筋长度不够,采取分离式的方法对构造负弯距短筋进行布设,没有双层双向钢筋对阳角处的房间进行加密加强,这会引起楼面斜向裂缝仍会扩展至放射筋的外侧和末端。
1.3在建筑施工阶段放射筋钢筋由于绑扎过程操作失误,致使放射钢筋和板面钢筋位置错误,导致板面的负弯距钢筋下压,就降低了板面负弯距钢筋的有效高度,且在浇筑过程中钢筋拐脚处容易上翘不利于平仓,出现了现浇钢筋混凝土楼面裂缝。
1.4 现浇钢筋混凝土質量不合格。一些商品混凝土的供货商采用偷工减料和以次充好的办法降低成本获取利润,出现细度模数不高、含泥量大中细砂来生产商品混凝土,以及性能和价位较低的混凝土处掺剂,而且掺入大量粉煤灰,以减少成本投入的现象。
2 现浇钢筋混凝土楼面裂缝的防治
2.1 重点加强楼面上层钢筋网的保护。钢筋在楼面混凝土板中的抗拉受力,能够抵御由外荷载引起的弯距,同时避免混凝土收缩及温度裂缝的出现,而钢筋只有具备上下保护层时,才能真正发挥这种抗拉受力的作用。
2.2 预埋线管处的裂缝防治预埋管线。尤其是管线分布较集中的地方,极大削弱了截面混凝土,造成应力集中,这样的薄弱部位极易出现裂缝。如果房屋开间的宽度不够,预埋的线管直径也小,且线管的敷设方向与混凝土的受拉及收缩方向不一致,楼面裂缝一般不会发生。敷设线管的过程中,不允许立体交叉穿越,通过线盒进行交叉布线,在管线集中的部位,不宜将管线平形布置,而是将其设置为放射形结构,这样在线管底部就能顺利进行混凝土的浇筑,从而振捣密实。
2.3 认真做好施工阶段的现场管理工作。楼层施工作业前要提前做好计划,合理安排主体结构施工的工期进度,搭设临时大开间面积材料吊卸堆放区域;模板支撑架之前,应提前使用加密立杆和搁栅来加强模板支撑架的刚度,避免发生变形,使这个区域的抗冲击振动荷载有所增加,必须将旧木模铺设在这个区域的新筑混凝土表面,从而使应力扩散,起到一定的保护作用,最大限度的避免裂缝的出现;安装模板的过程中,传递或吊运上来的材料不宜集中堆放,为最大限度的避免楼面荷重及振动,应该将其分散堆置;完成楼层混凝土浇筑后一定要加强养护,养护时间不宜超过24 小时。完成楼层混凝土浇筑后24 小时之内,可限于做部分准备工作。
2.4 加强对楼面混凝土的养护。混凝土的保湿养护对提升其性能及强度非常关键,尤其是早期养护阶段,可有效防止混凝土初期伸缩裂缝及脱水现象的产生。但对于具体的施工来讲,因为浇水及紧张的工期会对弹线和施工人员作业带来影响,所以楼面混凝土的浇水养护延续时间一般都不充足。鉴于此,施工时一定要用草包和麻袋覆盖表面进行为期一周的保湿养护,可利用喷 HL等品种及养护液加强养护,提高工作效率,减少成本投入,同时可降低甚至消除对施工的不利影响。
2.5加强对钢筋的保护。在高层建筑结构中钢筋起着抵抗外荷载产生的弯矩、防止混凝土收缩和抵抗温差应力防止发生温差裂缝的作用。因而加强对钢筋的保护,也是防止楼面裂缝的有效手段之一。但是在实际的操作中,由于施工过程中的各种交叉作业、施工人员的踩踏,导致钢筋受到了一定的损害。要加强对钢筋的保护,首先就要规范施工操作,减少因违规操作引起的钢筋破坏;根据施工路线搭设临时施工通道,减少踩踏钢筋的现象;在板面负筋和双层配筋的位置合理的配置钢筋小马凳,保护上下层位置。安排专业人员整修那些施工过程中遭到破坏的钢筋,特别是对支座等容易产生裂缝位置的钢筋要加强保护。
2.6加强对混凝土的施工控制。首先要严格控制混凝土的配合比,提高混凝土抗裂强度。在混凝土浇捣之前,要尽可能的浇透基层和模板。在振捣过程中,一定要振捣密实,防止混凝土漏振现象,但同时又要避免振捣过度。面积较大的板面,可以在浇筑后使用平板振动器进行二次振动,不仅可以防止混凝土局部密实不均匀,同时还能排除混凝土在粗骨料、水平钢筋下部生成的水分和空隙,使混凝土的抗裂性得到提高。混凝土楼板浇筑完成后,对表面的刮抹应该尽可能的少并且不能再其表面撒干水泥进行刮抹。同时还要加强混凝土的养护,特别是在早期,进行养护可以减少表面的脱水,减少伸缩裂缝。楼板浇筑后,对板面可用麻袋或是草帘进行覆盖保湿、保温,防止强风和烈日曝晒。
3 对现浇钢筋混凝土楼面裂缝的处理
对于现浇钢筋混凝土楼面裂缝的处理要在粉刷工序之前,确保粉刷和装修工作的顺利进行,不但可以有效处理楼面裂缝,而且还可以对裂缝起到加强的作用。
3.1将抗裂短钢筋、钢板网和钢丝网安装于找平层内,这样可以有效降低由于建筑物地面上部由于找平层较厚而带来的施工量增加的问题,又可以有效处理楼面裂缝。
3.2 处理好板底的裂缝工作。在建筑施工后期由于板底粉刷层厚度不够,又没有吊顶的遮盖层,楼面裂缝极易暴露,这不但不利于建筑和室内的美观,也极易导致工程甲乙双方的纠纷和建筑物业主的投诉,所以,应该将板底粉刷工作作为治理楼面裂缝的重要环节。
3.3复合增强纤维等材料处理板底袭缝法,聘用有资质的施工单位对较大的楼面裂缝进行粘贴、修补和加强,施工时应控制复合增强纤维的宽度,不但使复合增强纤维对裂缝起到修饰作用,也可以起到对裂缝的加强作用。
结语
现浇钢筋混凝土楼面裂缝的防治工作涉及的方面很多,本人建议在设计阶段做好现浇钢筋混凝土楼面裂缝的预防措施;在建筑物的施工阶段合理安排工期、严格执行施工工艺;在养护阶段控制好湿度和温度,就可以从技术和工作上有效控制现浇钢筋混凝土楼面的裂缝问题。由于本人水平有限,对现浇钢筋混凝土楼面裂缝的防治工作还存在着认识上的不足,希望同行能不客气地指出本文的缺点和漏洞,以便达到施工管理人员的共同进步,继而为社会更好的服务。
参考文献:
[1]梁兴平.浅析楼面裂缝的成因和防治[J].重庆建筑,2007(6)
[2]郑辉明.楼面裂缝成因分析及控制措施[J].科技资讯,2009(22)
[3]张洪军,黄焰辉.高层建筑楼面裂缝的分析与重点防治措施[J].民营科技,2010(01)
[4]贺翔.高层建筑结构楼面裂缝的原因分析和处理防治办法[J].中国高新技术企业,2008(05)
注:文章内所有公式及图表请以PDF形式查看。
关键词:楼面裂缝; 混凝土; 振捣; 养护
Abstract: the cast-in-situ reinforced concrete LouWu panel type of fracture is common in construction engineering a quality problem, it not only affect the speed of building construction, but also the service life of the buildings to affect, and it should be cause the attention of the construction industry. This paper, from the construction of the actual conditions, describes the cast-in-place reinforced concrete floor cracks reasons, puts forward the control cast-in-place reinforced concrete floor to the cracks, and I hope to cast-in-place reinforced concrete floor crack preventing a reference for the role.
Keywords: floor crack; Concrete; Vibrating; maintenance
中图分类号:TU37文献标识码:A 文章编号:
前言:现浇钢筋混凝土楼屋面板出现裂缝,是目前建筑业常见且难于彻底解决的难题之一,特别是在裂缝产生后,必然导致施工工期的延误、工程甲乙双方的纠纷、建筑物使用功能的降低以及建筑物使用寿命的缩短等不良后果。作为建筑业的从业人员应该清楚现浇钢筋混凝土楼面裂缝产生的原因,强化建筑设计、施工和养护阶段对现浇钢筋混凝土楼面裂缝的控制,做好现浇钢筋混凝土楼面裂缝的防控工作。接下来本文就针对现浇钢筋混凝土楼面裂缝的成因进行分析,对现浇钢筋混凝土楼面裂缝的防治要点进行探讨,希望可以起到一定的前期探索的作用。
1 现浇钢筋混凝土楼面裂缝的成因分析
1.1 在建筑施工的设计阶段,其一,忽视了混凝土在温度的影响下发生收缩和硬化时的自收缩,导致配置钢筋数量和强度不适合实际情况,产生楼面裂缝。其二,在设计建筑物的阳角、剪力墙和梁体时由于从设计缺乏对混凝土的自由形变,引起在实际施工中出现45 度的楼面裂缝。
1.2在建筑施工阶段外墙转角部位的放射形钢筋长度不够,采取分离式的方法对构造负弯距短筋进行布设,没有双层双向钢筋对阳角处的房间进行加密加强,这会引起楼面斜向裂缝仍会扩展至放射筋的外侧和末端。
1.3在建筑施工阶段放射筋钢筋由于绑扎过程操作失误,致使放射钢筋和板面钢筋位置错误,导致板面的负弯距钢筋下压,就降低了板面负弯距钢筋的有效高度,且在浇筑过程中钢筋拐脚处容易上翘不利于平仓,出现了现浇钢筋混凝土楼面裂缝。
1.4 现浇钢筋混凝土質量不合格。一些商品混凝土的供货商采用偷工减料和以次充好的办法降低成本获取利润,出现细度模数不高、含泥量大中细砂来生产商品混凝土,以及性能和价位较低的混凝土处掺剂,而且掺入大量粉煤灰,以减少成本投入的现象。
2 现浇钢筋混凝土楼面裂缝的防治
2.1 重点加强楼面上层钢筋网的保护。钢筋在楼面混凝土板中的抗拉受力,能够抵御由外荷载引起的弯距,同时避免混凝土收缩及温度裂缝的出现,而钢筋只有具备上下保护层时,才能真正发挥这种抗拉受力的作用。
2.2 预埋线管处的裂缝防治预埋管线。尤其是管线分布较集中的地方,极大削弱了截面混凝土,造成应力集中,这样的薄弱部位极易出现裂缝。如果房屋开间的宽度不够,预埋的线管直径也小,且线管的敷设方向与混凝土的受拉及收缩方向不一致,楼面裂缝一般不会发生。敷设线管的过程中,不允许立体交叉穿越,通过线盒进行交叉布线,在管线集中的部位,不宜将管线平形布置,而是将其设置为放射形结构,这样在线管底部就能顺利进行混凝土的浇筑,从而振捣密实。
2.3 认真做好施工阶段的现场管理工作。楼层施工作业前要提前做好计划,合理安排主体结构施工的工期进度,搭设临时大开间面积材料吊卸堆放区域;模板支撑架之前,应提前使用加密立杆和搁栅来加强模板支撑架的刚度,避免发生变形,使这个区域的抗冲击振动荷载有所增加,必须将旧木模铺设在这个区域的新筑混凝土表面,从而使应力扩散,起到一定的保护作用,最大限度的避免裂缝的出现;安装模板的过程中,传递或吊运上来的材料不宜集中堆放,为最大限度的避免楼面荷重及振动,应该将其分散堆置;完成楼层混凝土浇筑后一定要加强养护,养护时间不宜超过24 小时。完成楼层混凝土浇筑后24 小时之内,可限于做部分准备工作。
2.4 加强对楼面混凝土的养护。混凝土的保湿养护对提升其性能及强度非常关键,尤其是早期养护阶段,可有效防止混凝土初期伸缩裂缝及脱水现象的产生。但对于具体的施工来讲,因为浇水及紧张的工期会对弹线和施工人员作业带来影响,所以楼面混凝土的浇水养护延续时间一般都不充足。鉴于此,施工时一定要用草包和麻袋覆盖表面进行为期一周的保湿养护,可利用喷 HL等品种及养护液加强养护,提高工作效率,减少成本投入,同时可降低甚至消除对施工的不利影响。
2.5加强对钢筋的保护。在高层建筑结构中钢筋起着抵抗外荷载产生的弯矩、防止混凝土收缩和抵抗温差应力防止发生温差裂缝的作用。因而加强对钢筋的保护,也是防止楼面裂缝的有效手段之一。但是在实际的操作中,由于施工过程中的各种交叉作业、施工人员的踩踏,导致钢筋受到了一定的损害。要加强对钢筋的保护,首先就要规范施工操作,减少因违规操作引起的钢筋破坏;根据施工路线搭设临时施工通道,减少踩踏钢筋的现象;在板面负筋和双层配筋的位置合理的配置钢筋小马凳,保护上下层位置。安排专业人员整修那些施工过程中遭到破坏的钢筋,特别是对支座等容易产生裂缝位置的钢筋要加强保护。
2.6加强对混凝土的施工控制。首先要严格控制混凝土的配合比,提高混凝土抗裂强度。在混凝土浇捣之前,要尽可能的浇透基层和模板。在振捣过程中,一定要振捣密实,防止混凝土漏振现象,但同时又要避免振捣过度。面积较大的板面,可以在浇筑后使用平板振动器进行二次振动,不仅可以防止混凝土局部密实不均匀,同时还能排除混凝土在粗骨料、水平钢筋下部生成的水分和空隙,使混凝土的抗裂性得到提高。混凝土楼板浇筑完成后,对表面的刮抹应该尽可能的少并且不能再其表面撒干水泥进行刮抹。同时还要加强混凝土的养护,特别是在早期,进行养护可以减少表面的脱水,减少伸缩裂缝。楼板浇筑后,对板面可用麻袋或是草帘进行覆盖保湿、保温,防止强风和烈日曝晒。
3 对现浇钢筋混凝土楼面裂缝的处理
对于现浇钢筋混凝土楼面裂缝的处理要在粉刷工序之前,确保粉刷和装修工作的顺利进行,不但可以有效处理楼面裂缝,而且还可以对裂缝起到加强的作用。
3.1将抗裂短钢筋、钢板网和钢丝网安装于找平层内,这样可以有效降低由于建筑物地面上部由于找平层较厚而带来的施工量增加的问题,又可以有效处理楼面裂缝。
3.2 处理好板底的裂缝工作。在建筑施工后期由于板底粉刷层厚度不够,又没有吊顶的遮盖层,楼面裂缝极易暴露,这不但不利于建筑和室内的美观,也极易导致工程甲乙双方的纠纷和建筑物业主的投诉,所以,应该将板底粉刷工作作为治理楼面裂缝的重要环节。
3.3复合增强纤维等材料处理板底袭缝法,聘用有资质的施工单位对较大的楼面裂缝进行粘贴、修补和加强,施工时应控制复合增强纤维的宽度,不但使复合增强纤维对裂缝起到修饰作用,也可以起到对裂缝的加强作用。
结语
现浇钢筋混凝土楼面裂缝的防治工作涉及的方面很多,本人建议在设计阶段做好现浇钢筋混凝土楼面裂缝的预防措施;在建筑物的施工阶段合理安排工期、严格执行施工工艺;在养护阶段控制好湿度和温度,就可以从技术和工作上有效控制现浇钢筋混凝土楼面的裂缝问题。由于本人水平有限,对现浇钢筋混凝土楼面裂缝的防治工作还存在着认识上的不足,希望同行能不客气地指出本文的缺点和漏洞,以便达到施工管理人员的共同进步,继而为社会更好的服务。
参考文献:
[1]梁兴平.浅析楼面裂缝的成因和防治[J].重庆建筑,2007(6)
[2]郑辉明.楼面裂缝成因分析及控制措施[J].科技资讯,2009(22)
[3]张洪军,黄焰辉.高层建筑楼面裂缝的分析与重点防治措施[J].民营科技,2010(01)
[4]贺翔.高层建筑结构楼面裂缝的原因分析和处理防治办法[J].中国高新技术企业,2008(05)
注:文章内所有公式及图表请以PDF形式查看。