To study the stress, deformation, and seepage pressure during the initial impoundment of the Jinping-I Arch Dam, monitoring analysis and numerical calculation were used in a dam behavior analysis that focused on the working behavior of the dam during the late period of the initial impoundment up to the end of November 2014. The numerical calculation was performed based on feedback analysis of the deformation and stress of the arch dam through inversion of the elastic moduli(E) of the dam body and foundation, using a three-dimensional finite element model for the linear elastic material of the arch dam. The main monitoring indices presented insignificant changes in the late period of the initial impoundment, and the results of feedback analysis were consistent with monitoring results. Analysis results also show that the deformations of the dam body and dam foundation were within the design range; the dam stress distributions were normal, with values lower than the design control criteria; and the seepage flows through the dam body and dam foundation were lower than the design drainage capacity of the deep-well pump house, demonstrating that the Jinping-I Arch Dam was in good working condition, and the initial impoundment had been successfully completed. The results of the working behavior analysis of the Jinping-I hydropower project during the initial impoundment can provide references for safe operation of similar projects. To study the stress, deformation, and seepage pressure during the initial impoundment of the Jinping-I Arch Dam, monitoring analysis and numerical calculation were used in a dam behavior analysis that focused on the working behavior of the dam during the late period of the initial impoundment up to the end of November 2014. The numerical calculation was performed based on feedback analysis of the deformation and stress of the arch dam through inversion of the elastic moduli (E) of the dam body and foundation, using a three-dimensional finite element model for the linear elastic material of the arch dam. The main monitoring indices presented insignificant changes in the late period of the initial impoundment, and the results of feedback analysis were consistent with monitoring results. Analysis results also show that the deformations of the dam body and dam foundation were within the design range; the dam stress distributions were normal, with values ​​lower than the design control criteri a; and the seepage flows through the dam body and dam foundation were lower than the design drainage capacity of the deep-well pump house, demonstrating that the Jinping-I Arch Dam was in good working condition, and the initial impoundment had been successfully completed The results of the working behavior analysis of the Jinping-I hydropower project during the initial impoundment can provide references for safe operation of similar projects.
其他文献
期刊
生物柴油生产过程的副产物甘油可进一步脱水生成应用广泛的中间产物丙烯醛.自1918年Sabatier首次报道了在Al2O3及UO2催化剂上进行甘油气相脱水制丙烯醛以来,直至今日开发出众
期刊
对宕石大桥施工过程中塔梁联结情况和边跨合龙方法进行了分析和探讨。 This paper analyzes and discusses the connection between the tower girder and the side-span br
期刊
In this paper, two different concepts for the constitutive modeling of the mechanical behavior of creep-sensitive rockfill materials are presented. Specifically
期刊
包砂路基越来越广泛地应用于高速公路工程 ,由于砂土与粘土工程性质差别较大 ,二者结合部成为影响工程质量的关键所在 ,也是施工的难点。本文从实践出发 ,围绕解决砂土、粘土